127
<br /> CommunitySmall 1 1 Construction 1
<br /> Total Collection System Costs
<br /> Constructed costs for various small community grinder, gravity,and Orenco Effluent Sewer projects are tabulated in Table 11. Costs are highly
<br /> dependent on local site conditions (soil conditions, groundwater depth, surface restoration requirements,topography,and material choices) and
<br /> therefore are only provided for general comparison purposes. 2014 USD costs are adjusted using Engineer News Record Construction Cost Index
<br /> (ENRCCI).
<br /> Table 11.Total Collection System Costs:*Orenco Effluent Sewers.
<br /> Project Name Year Connections Bid USD/Connection USD/Connection(2014)
<br /> Atoka,TN 2009 226 $1,816,115 $8,036 $9,113
<br /> Ewing,VA 2010 25 $150,884 $6,035 $6,666
<br /> Morefield Bottom,VA 2010 53 $610,979 $11,528 $12,733
<br /> Tishomingo, MO 2010 238 $2,213,656 $9,301 $10,274
<br /> Lexington, IN 2010 117 $1,117,792 $9,554 $10,553
<br /> Perks, IL 2011 58 $544,715 $9,392 $10,064
<br /> EI Dorado,AR 2011 402 $3,085,873 $7,676 $8,226
<br /> Hillsdale, NY 2011 130 $922,750 $7,098 $7,606
<br /> Fulton Phase I,AL 2012 130 $1,037,545 $7,981 $8,334
<br /> Christiansburg, OH 2013 242 $2,042,550 $8,440 $8,592
<br /> Cleveland, MS(Isaac Daniels) 2013 36 $401,890 $11,163 $11,365
<br /> Cleveland, MS(Stanton) 2013 43 $453,816 $10,553 $10,744
<br /> Cleveland, MS(Noblin) 2013 76 $692,995 $9,118 $9,283
<br /> McIntosh,AL 2013 409 $3,205,307 $7,836 $7,978
<br /> Eagleville,TN 2014 150 $1,429,317 $9,528 $9,529
<br /> Woden, IA" 2014 147 $2,306,052 $15,687 $15,687
<br /> Coffeeville,AL 2014 200 $1,638,943 $8,194 $8,195
<br /> The tanks in Woden,IA,were between five and ten feet deep.USD 2014 costs adjusted per ENRCCI.
<br /> Table 12.Total Collection System Costs:*Grinder Sewers.
<br /> Project Name Year Connections Bid USD/Connection USD/Connection (2014)
<br /> Carlisle(Avon Lake), IA 2008 152 $1,409,456 $9,272 $10,845
<br /> Ellston, IA 2010 31 $440,423 $14,207 $15,693
<br /> Fenton, IA 2011 185 $2,014,830 $10,890 $11,670
<br /> Leisure Lake, IA 2012 339 $3,294,798 $9,719 $10,148
<br /> Ringgold, IA 2012 104 $1,390,888 $13,373 $13,964
<br /> Lampton, MS 2013 516 $3,288,329 $6,372 $6,488
<br /> USD 2014 costs adjusted per ENRCCI.
<br /> ®2014 Orenco Systems®Inc. NFS-EFS-CC-1
<br /> Rev.1.6,©08/14
<br /> Page 9 of 13
<br />
|