Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 1:34:01 PM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2025\Agenda - 02-04-2025 Business Meeting
Minutes 02-04-2025-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2025
ORD-2025-005-An Ordinance Amending the UDO of Orange County
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2025
OTHER-2025-005-Acceptance of the Agricultural Growth Zone Grant with the North Carolina Department of Agriculture
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-006-CHCCS & OCS Schools Adequate Public Facilities Ordinance Approval of Membership and Capacity Numbers
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-007-OCS-SAPFO- Schools Adequate Public Facilities Ordinance -Approval of Membership and Capacity Numbers
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-015-Statement of Consistency of a Proposed UDO Text Amendment with Adopted Orange County Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
OTHER-2025-016-Statement of Inconsistency of a Proposed Zoning Atlas Map Amendment with the Adopted Orange County 2030 Comprehensive Plan and Other ApplicableAdopted Plans
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2025
PRO-2025-001-Black History Month Proclamation
(Message)
Path:
\Board of County Commissioners\Proclamations\2020-2029\2025
RES-2025-010-Motor Vehicle Property Tax Release Refund
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
RES-2025-011-Late Applications for Property Tax Exemption Exclusion
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
105 <br /> To obtain information more specific to the property, hydrogeologists and geophysicists were consulted <br /> to survey the property. Their survey disclosed on the property the robust presence of diabase dikes, <br /> geologic formations that are highly correlated with abundant groundwater at depths of 200-400 feet. <br /> They reported four candidate sites for wells placements they consider to have a high probability of <br /> success in obtaining substantial water flow rates from wells drilled at those locations. In their <br /> experience, yields from wells sited near diabase formation are typically 40 gpm or more. <br /> F, Zhat(u) - <br /> -4 A—*4 <br /> ° 41tli Yf�l <br /> LONAK!WE&RAW Out <br /> GMA <br /> a `- %f LCL�+bi575 II <br /> -_rte <br /> - rr+ru.a.L <br /> x <br /> i <br /> Representatives from the Division of Water Resources, Public Water Supply Section, of the North <br /> Carolina Department of Environmental Quality visited two candidate sites and verbally indicated that <br /> both sites were suitable. A Letter of Compliance was sent to DEQ by H4D regarding these sites, and a <br /> Preliminary Well Site Approval Letter is expected soon. Wells will be drilled incrementally to supply the <br /> amount required in each phase of the project. <br /> Fire suppression for the development will be designed to meet Orange County fire code and the <br /> International Building Code (IBC) standards. The fire flow will be designed to meet Appendix B, Tables <br /> B105.1(1) and (2) of the IBC. The multi-family residence building will be equipped with a sprinkler <br /> system and final design flow requirements will be determined in the detail design phase of the project. <br /> Any other buildings requiring sprinkler systems will be determined as the design and scope of the <br /> project progress, Should it be determined that the buildings require sprinkler systems, the appropriate <br /> fire flow will be determined. <br />
The URL can be used to link to this page
Your browser does not support the video tag.