Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 11:36:51 AM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 02-04-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
99 <br /> Hands Four Development Cooperative <br /> -"V;IY'iddlehead- PO Box 1201 Carrboro,NC 27510 <br /> Corner HandsFourDevelopment@gmail.com <br /> Wastewater Collection and Treatment - WD will build and operate a community wastewater <br /> system to service all the residence and common buildings of the community. This system will <br /> consist of STEP (septic tank effluent pressurized) tanks, a central secondary treatment plant <br /> and subsurface effluent discharge areas. STEP tanks allow settling of solid matter, with dilute <br /> discharge liquid that can be conveyed through small-diameter mains under pressure to follow <br /> topography rather than rely on gravity. Secondary treatment with a circulation over a textile <br /> medium efficiently creates a highly purified odorless effluent. This effluent is suitable for <br /> reclaimed water uses and such use will be evaluated. <br /> Subsurface discharge is a technique using a small diameter tubing that can be implemented in <br /> forested areas with only the removal of brush and scrub. Areas sufficient for the anticipated <br /> discharge have been reserved for that purpose in the Master Plan. Soils in those areas were <br /> evaluated and found to have sufficient long-term acceptance rates to support the expected <br /> effluent rates. A commercial operator will be contracted to manage the system. <br /> The location of the STEP collection tanks, the collection system, the treatment facilities and <br /> the primary wastewater distribution area are shown on the Utility Plan exhibit. <br /> H4D Utilities, Pg 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.