Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 11:36:51 AM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 02-04-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
70 <br /> RAMEY KEMP ASSOCIATES Fiddlehead I E-4 <br /> Based on coordination with the NCDOT and the County, it was determined there were no future <br /> roadway improvements to consider with this study. <br /> S. Capacity Analysis Summary <br /> The study analyzes traffic conditions during the weekday AM and PM peak hours for the <br /> following scenarios: <br /> • 2023 Existing Traffic Conditions <br /> • 2027 No-Build Traffic Conditions <br /> • 2027 Build Traffic Conditions <br /> • 2030 No-Build Traffic Conditions <br /> • 2030 Build Traffic Conditions <br /> 6. Recommendations <br /> Based on the findings of this study, specific geometric improvements have been identified and <br /> are recommended to accommodate future traffic conditions. See a more detailed description of <br /> the recommended improvements below. Refer to Figures E-1 and E-2 for an illustration of the <br /> recommended lane configuration for the proposed development under phase 1 (2027) and at full <br /> buildout (2030), respectively. <br /> Recommended Improvements by Developer - Phase 1 (2027) <br /> Morrow Mill Road and Site Access A <br /> • Construct Site Access A with one ingress and one egress lane (shared left-right). <br /> Recommended Improvements by Developer - Full Build (2030) <br /> NC 54 and Morrow Mill Road <br /> • Construct a northbound Morrow Mill Road right turn lane with 150 feet of storage <br /> and appropriate taper length. <br /> Morrow Mill Road and Site Access A <br /> • Construct a westbound Morrow Mill Road left turn lane with 50 feet of storage and <br /> appropriate taper length. <br /> ARAMEY KEMP ASSOCIATES <br /> 1%14C TOGETHER WE ARE LIMITLESS <br />
The URL can be used to link to this page
Your browser does not support the video tag.