Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 11:36:51 AM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 02-04-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
322 <br /> Parks and Recreation Objective PR-5.1 <br /> Locate parks and recreational facilities close to residential areas to encourage <br /> informal interaction with nature, encourage walkability, and create areas of wildlife <br /> habitat with appropriate recreational facilities within the more populated areas. <br /> Parks and Recreation Objective PR-5.4 <br /> Encourage development of a system of private open space and conservation <br /> areas, including nature preserves, parks, linear parks, and scenic vistas <br /> compatible with the character of Orange County. <br /> Services and Facilities Overarching Goal <br /> Growth consistent with the provision of adequate and sustainable County services <br /> and facilities while managing the impacts upon the environmental infrastructure <br /> and effectively protecting the County's natural and cultural resources. <br /> Services and Facilities Goal 2 <br /> Adequate, safe, and healthy groundwater withdrawal and wastewater disposal <br /> systems with minimal impacts upon water and land resources. <br /> Services and Facilities Objective WW-18 <br /> Allow on-site wastewater disposal in rural areas where soil conditions are <br /> acceptable. Where there are unacceptable soils, state-approved on-site sewage <br /> disposal systems shall be required. <br /> Services and Facilities Goal 5 <br /> Efficient and effective drainage, stormwater, floodplain management, and erosion <br /> control systems. <br /> Services and Facilities Objective EC-1 <br /> Continue to use Best Management Practices (BMP's) for stormwater control, as <br /> outlined within the Orange County Unified Development Ordinance, to minimize <br /> potential adverse impacts on the water quality. <br /> Services and Facilities Objective EC-6 <br /> Protect and maintain the existing aquatic, riparian and terrestrial habitats-of fish <br /> and wildlife. <br /> Services and Facilities Objective PS-T-5 <br /> Include in applied site design standards for residential, commercial, and industrial <br /> development, appropriate road design standards to ensure adequate law <br /> enforcement and emergency vehicle access to the development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.