Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 11:36:51 AM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 02-04-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lan <br /> Land Use Buffers/Setbacks <br /> North MPD-CD Buffers Determined at Time of Approval/ No Requirement <br /> South MPD-CD Buffers Determined at Time of Approval/ No Requirement <br /> East MPD-CD Buffers Determined at Time of Approval/ No Requirement <br /> West MPD-CD Buffers Determined at Time of Approval/ No Requirement <br /> Stream Buffers <br /> Stream buffers shall be in accordance with the provisions of Section 6.13 of the UDO and are 65 ft. based <br /> on slope. A Zoning Report of the property that gives an aerial image of the Stream Buffer areas is <br /> attached to this report. <br /> Environmental Assessment (EA) <br /> The applicant has provided an Environmental Assessment (EA) application and supporting materials as <br /> required in Section 6.16 of the UDO with their submittal. These materials were subsequently shared with <br /> various State agencies via the NC Department of Administration's State Clearinghouse. Planning and <br /> DEAPR Staff have also jointly reviewed the materials and agree with a determination and Finding of No <br /> Significant Impact (FONSI) as required in Section 2.25.1(B)(5) of the UDO. This determination eliminates <br /> a require from the applicant to provide a more detailed Environmental Impact Statement (EIS) process as <br /> outlined in Sections 2.25.2 and 6.6A of the UDO. <br /> Solid Waste <br /> The applicant has indicated development within the project will conform to the Orange County Solid <br /> Waste Management Ordinance (Attachment 5). <br /> Proposed Conditions <br /> The following conditions have been proposed by either the applicant or staff: <br /> 1. Per UDO Section 6.7, the Master Plan presented as part of the application in Attachment Al will <br /> determine allowable uses, the layout including setbacks and buffers, maximum building heights, a <br /> utility master plan showing all proposed locations of utility lines, structures and accompanying <br /> easements for sanitary sewer, potable water, and stormwater, development lots/pods with <br /> acreage, a master sign plan, the interior roadway plan, proposed access/driveway points, and all <br /> proposed on-site recreation and/or open space, and architectural concepts. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.