Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 11:36:51 AM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 02-04-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
109 <br /> Hands Four Development Cooperative <br /> SW Orange County, NC <br /> Page 4 <br /> The latitudes and longitudes of the proposed well sites are: <br /> Well Name Easting (NC STATE Northing (NC Longitude Latitude <br /> PLANE) ft STATE PLANE) ft <br /> Well A 1937058 792235 -79.212580 35.926591 <br /> Well B 1937112 791484 -79.212402 35.924507 <br /> Well C 1937424 791729 -79.211323 35.925216 <br /> Well D 1936765 793446 -79,213588 35.929894 <br /> The proposed well locations should be surveyed by a licensed land surveyor to ensure they will <br /> be positioned to meet all the setback requirements from final structures constructed on this <br /> site. GMA does not offer professional land surveying services. The minimum horizontal <br /> separation, as required by North Carolina well construction standards, is generally 100 feet from <br /> all property boundaries, 100 feet from all surface water features (streams, ponds), and 100 feet <br /> from pavement. Orange County may have more restrictive requirements, so the County should <br /> be contacted during the permitting process to be sure the proper local setbacks are met. You <br /> should expect that well depths will be between 200 and 400 feet below land surface. <br /> GMA hopes this information will aid you in the development of your property. As you are <br /> aware, developing a groundwater system as a source of water supply in the fractured rock <br /> aquifers in North Carolina can be difficult and somewhat unpredictable. Therefore, GMA does <br /> not guarantee successful well installation at any well sites we have proposed. GMA made <br /> recommendations based upon our observations of the geology of the area, and we used our <br /> experience to select sites that we believe have the greater probability of providing you with <br /> higher well yields. <br /> We appreciate the opportunity to provide this report to you. If you have any questions, please <br /> feel free to contact me. <br /> Best Regards, <br /> Groundwater Management Associates, Inc. <br /> ►V� f <br /> r , <br /> William L. Lyke, P.G., P.E. Amy W. Cressman, P.G. <br /> Senior Hydrogeologist/Civil Engineer Project Hydrogeologist <br /> Copy: Jay Halley, P.G., GMA <br /> John Wise, P.E., GMA <br />
The URL can be used to link to this page
Your browser does not support the video tag.