Browse
Search
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2025
>
Agenda - 02-04-2025 Business Meeting
>
Agenda - 02-04-2025; 5-a - Applications for Zoning Atlas Amendment, Comprehensive Plan Amendments, & UDO Text Amendments to Realize “Fiddlehead Corner”, a Master Plan Development – Conditional District
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2025 1:32:28 PM
Creation date
1/30/2025 11:36:51 AM
Metadata
Fields
Template:
BOCC
Date
2/4/2025
Meeting Type
Business
Document Type
Agenda
Agenda Item
5-a
Document Relationships
Agenda for February 4, 2025 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2025\Agenda - 02-04-2025 Business Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
101 <br /> %�Ifiddlehead <br /> Hands Four Development Cooperative <br /> PO Box 1201 Carrboro, NC 27510 <br /> -� Corner <br /> HandsFourDevelopment@gmail.com <br /> Fiddlehead Corner Anticipated Development Schedule <br /> March 20, 2024 <br /> A proposed schedule for development of Fiddlehead Corner has several design and approval <br /> steps subsequent to the MDP-CD zoning approval that we expect could be in fall 2024. <br /> NC DEQ approvals and associated county approvals for the wells, water treatment system, and the <br /> wastewater treatment and distribution system will take approximately 1 year. <br /> During that period, detailed access easement streets and phasing plans for the construction of <br /> the utilities and phase one residential and community buildings and other components will take <br /> place. Detailed tree surveys will take place at the stream buffer borders and perimeter land <br /> use-buffers to determine if the drip lines of trees at the edge of the buffers will require additional <br /> tree protection. Location of and removal of invasive species will also be undertaken during this <br /> time. <br /> An Erosion Control Plan will be prepared and submitted for review and approval to establish safe <br /> access to the property from existing entrances on Morrow Mill Rd. and Gold Mine Loop Rd. to <br /> provide access for well drilling and other onsite activity prior to the approval of construction plans <br /> for the development of Phase 1. <br /> Limited site preparation activities could begin in spring 2025 with more extensive site <br /> development work beginning in summer 2025. <br /> Phase 1 is expected to take approximately 18 — 24 months for completion with the occupancy <br /> of the first 50 dwelling units in 2027 in accordance with the information in the TIA submitted to and <br /> reviewed by the county and NCDOT. <br /> Phases 2 & 3 of development, as shown on the Illustrative Master Plan Phasing Plan, will be <br /> completed in 2028-2029. The TIA accounts for full buildout in 2030, which allows for a full <br /> buildout plus one year for TIA analysis purposes. <br /> ZAA 13 CZ Dev Schedule Statement 2024-03-20.docx 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.