Browse
Search
OUTBoard Jan 21 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Jan 21 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 4:35:55 PM
Creation date
1/14/2025 4:35:41 PM
Metadata
Fields
Template:
BOCC
Date
1/21/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # DescriptionLET/Start DateCompletion DateCost Status Project LeadNCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENTB-6037 Replace Bridge #49 over Norfolk Southern Railway on NC 86 4/20/2027 FY2031 $10,600,000 Planning and design activities underway Brandon GreenBP7-R013 Replace Bridge #90 on SR 1940 (Damascus Church Road) 9/16/2027 FY2030$800,000 Planning and design activities underwayPlans at 25%Daniel DagenhartEB-5880 Construct sidewalk on the north side of SR 1005 (Jones Ferry Road) from Davie Road to SR 1010 (West Main St.) in Carrboro9/30/2027 FY2029 $441,000 Municipal agreement needs to be requested and executed to begin work.Town of Carrboro/Stephen RobinsonEB-5890 Construct sidewalk on Barnes Street from King Street to SR 1005 (Jones Ferry Road) in Carrboro9/30/2027 FY2029 $230,000 Municipal agreement needs to be requested and executed to begin work.Town of Carrboro/Stephen RobinsonBR-0247 Replace Bridge #29 on US 70 Business/NC 86 over Cates Creek11/16/2027 FY2029 Pending Preliminary activities pending Bryan KeyBR-0091 Replace Bridge #32 on US 70 over the Eno River 10/17/2028 FY2032 $4,000,000 Planning and design activities underway Jon GaillardBP7-R015 Replace Bridge #86 on SR 1942 (Jones Ferry Road) 9/6/2029 FY2031 $1,700,000 Planning and design activities underway. Detour needs improvements so will need to see if resurfacing funds available or switch to TIP project. TBDDaniel DagenhartU-5845 50235.1.1 50235.2.1 50235.3.1Widen SR 1009 (South Churton Street) to multi-lanes from I-40 to Eno River in Hillsborough7/16/2030 FY2033 $49,238,000 PE funding approved 5/14/15, Planning and Design activities underway, Coordinate with I-0305B which was formerly I-5967.Radha AttaluriBP7-R007 Replace Bridge #63 on Pleasant Green Road 9/5/2030 FY2033 $2,500,000 Planning and design activities underway Daniel DagenhartPage 3DCHCMPO Oct 2024
The URL can be used to link to this page
Your browser does not support the video tag.