Browse
Search
OUTBoard Jan 21 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Jan 21 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 4:35:55 PM
Creation date
1/14/2025 4:35:41 PM
Metadata
Fields
Template:
BOCC
Date
1/21/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # DescriptionLET/Start DateCompletion DateCost Status Project LeadNCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENTEB-5721 Upgrade existing off-road path and construct new section of path of Bicycle Route #1 from Cleland Drive to Willow Drive in Chapel Hill9/25/2025 FY2026 $2,400,000 Bids opened 7/17/23 - Bids rejected. Project on Hold. Chapel Hill to seek additional funding and relet at a future date.Town of Chapel Hill/Stephen RobinsonHO-0013 51177.1.1 51177.2.1 51177.2.2 51177.3.1Chapel Hill from Franklin Street and Rosemary Street, and the streets in between from Merritt Mill Road to Henderson Street in downtown Chapel Hill. Install new mast arm and curb and sidewalk improvements.2/26/2026 FY28 $2,100,000 Project approved by BOT and assigned. Municipal agreement executed.Stephen RobinsonC-5650 Construct sidewalk on one side of SR 1919 (Smith Level Road/S. Greensboro St.) from Public Works Drive to the northern end of Old Pittsboro Road in Carrboro4/19/2026 FY2028 $1,718,000 Carrboro approved to incorporate water line work into design. Env doc returned w comments on 12/10/21. Document to be updated to include additional limits for resurfacing. NCDOT waiting on revised plans to be s bmitted for re ieTown of Carrboro/Stephen RobinsonI-3306AC I-40 at NC 86 - Upgrade to superstreet from Northwood Drive to Ramp C/D at I-40 interchange5/19/2026 FY2029 $4,350,000 Planning and design activities underway Radha AttaluriBP7-R009 Replace Bridge #11 on SR 1336 (Halls Mill Road) 9/17/2026 FY2029 $2,900,000 Planning and design activities underwayROW acquisisition complete.Daniel DagenhartEB-5886A Construct sidewalk/MUP/bike lanes on Estes Drive from SR 1772 (North Greensboro Street) to south of Norfolk Southern Railroad Tracks in the Town of Carrboro9/17/2026 FY2029 $848,000 Municipal agreement needs to be requested and executed to begin work.Town of Carrboro/Stephen RobinsonEB-5998 Construct MUP on US 15/501 from Willow Drive to SR 1741/SR 1838 (Old Durham Chapel Hill Road) in Chapel Hill9/30/2026 FY2028 $2,044,000 Municipal agreement needs to be requested and executed to begin work.Town of Chapel Hill/Stephen RobinsonEB-5886B Construct sidewalk/MUP/bike lanes on Estes Drive from south of Norfolk Southern Railroad to NC 86 (MLK Jr. Blvd.) in Chapel Hill10/1/2026 FY2028 $3,104,000 Municipal agreement executed and project development underway.Town of Chapel Hill/Stephen RobinsonI-5958 45910.1.1 45910.3.1Pavement Rehabilitation on I-40/I-85 from West of SR 1114 (Buckhorn Road) to West of SR 1006 (Orange Grove Road)11/17/2026 FY2028 $8,690,000 Planning and design activities pending Trung NguyenPage 2DCHCMPO Oct 2024
The URL can be used to link to this page
Your browser does not support the video tag.