Browse
Search
OUTBoard Jan 21 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Jan 21 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 4:35:55 PM
Creation date
1/14/2025 4:35:41 PM
Metadata
Fields
Template:
BOCC
Date
1/21/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # DescriptionLET/Start DateCompletion DateCost Status Project LeadSS-6207T 51112Portions of Twenty-One (21) Routes. Curve Warning Sign Installation.9/20/2023 9/30/24 $200,000 Planning and design activities underway. Construction started.Dawn McPhersonSS-6207A 50337 NC 54 Pedestrian improvements between SR 1902 (Manning Drive) and SR 1937 (Old Fayetteville Road) in Chapel Hill and Carrboro. Improvements will include refuge islands, crosswalks and pedestrian signals. Improvements to be completed by state forces.2/15/2024 10/31/2024 $171,000 Planning and design activities underway. Materials have arrived and work has begun.Dawn McPhersonU-4726DF Bicycle detection at signalized intersections in Carrboro8/15/2024 Spring 2025$36,000 Plans at 90% completion - Plan review comments returned back to the Town of Carrboro for revisions. Re-Let (Low bid concurrence package under review)Town of Carrboro/Stephen RobinsonC-5181 Jones Creek Greenway Project - Fill Gap between the Carrboro Upper Bolin Trail and Twin Creeks Greenway and also implement program to support on-vehicle trips to Morris Grove Elementary School11/21/2024 FY2026 $654,000 Environmental document approved 8/14/23. NCDOT to review plans once Carrboro develops and submits.Town of Carrboro/Stephen RobinsonHS-2007J Install a new crosswalk with Rapid Rectangular Flashing Beacons (RRFB), raised center island, pedestrian signage, and approximately 125 linear feet of sidewalk on NC 86 at Critz Drive in Chapel Hill11/21/2024 6/30/2025 $300,000 Planning and deisgn activities underway Suzana MattsHL-0045 Repair Bridge #241 on Exchange Park Lane over Eno River from South Churton Street to Faribult Lane in Hillsborough1/16/2025 FY2027 $153,800 Agreement executed, Hillsborough to prepare environmental documents and plans. Review of final plans underway.Town of Hillsborough/Stephen RobinsonBL-0044 49998.1.1NC 54 from Westbrook Drive in Carrboro to west of US 15/501/NC 86 (South Columbia Street) interchange in Chapel Hill. Construct sidewalk and install pedestrian signals, crosswalks, and refuge islands at selected locations.1/16/2025 7/31/2025 $1,311,000 Construction funding to be requested once municipal agreements are executed. Chapel Hill MA executed, Carrboro MA has also been executed. Utility Relocations Underway.Trung NguyenP-5701B 46395.1.1 46395.3.3Construct Platform, Passenger Rail Station Building at Milepost 41.7 Norfolk Southern H-line in Hillsborough6/30/2025 FY2026 $7,200,000 PE funding scheduled 7/1/2020. Planning and deisgn activities underwayMatthew SimmonsBR-0092 Replace Bridge #37 on NC 86 over New Hope Creek 8/19/2025 FY2028 $2,900,000 Planning and design activities underway Alexander FosterNCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENTPage 1DCHCMPO Oct 2024
The URL can be used to link to this page
Your browser does not support the video tag.