Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br />U-5844 <br />50234.1.1 <br />50234.2.1 <br />50234.3.1 <br />Construct multi-lanes on NC62 from SR 1430 (Ramada <br />Road) to US 70 (South Church Street) in Burlington <br />3/16/27 FY2030 $21,000,000 Planning and design activities <br />underway - Field Inspection held. <br />ROW acquisitions 75% complete. <br />Brandon Green <br />BP7-R016 Replace Bridge #113 on SR 1003 (Lindley Mill Road)10/7/27 FY2029 $1,200,000 Planning and design activities <br />underway - Plans at 65% <br />Daniel Dagenhart <br />B-6052 <br />48709.1.1 <br />48709.2.1 <br />48709.3.1 <br />Replace bridge 68 over NCRR / Norfolk Southern Railroad on <br />SR 1928 (Trollingwood Road) in Haw River <br />1/18/28 FY2029 $2,500,000 PE funding approved 5/6/19. <br />Planning and design activities <br />underway. <br />David Stutts <br />U-6013 <br />47158.1.4 <br />47158.2.4 <br />47158.3.4 <br />Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- <br />Hawfields Rd)/ SR 2126 (Old Hillsborough Rd) to Lowes Blvd <br />(non-system) in Mebane. <br />5/16/28 FY2031 $6,200,000 Planning and design activities <br />underway, ROW certified and <br />utilities underay. <br />Suzana Matta <br />U-6114 Install traffic signal and add turn lanes at NC 62 (Alamance <br />Road) at SR 1155 (Hatchery Road)/Bonnie Lane intersection <br />in Burlington <br />10/16/29 FY2031 $900,000 Planning and design activities <br />pending. (Funded for Prelim. <br />Engineering only) <br />Brandon Green <br />U-6009 <br />47144.1.1 <br />47144.2.1 <br />47144.3.1 <br />Widen and construct center turn lane on US70 (West Church <br />St) from Tarleton Ave. to Fifth Street in Burlington <br />1/15/30 FY2032 $6,337,000 Planning and design activities <br />underway <br />Suzana Matta <br />I-6009 <br />47962.1.1 <br />47962.2.1 <br />47962.3.1 <br />Interchange improvements at I-40/I-85 and SR 1158 <br />(Huffman Mill Road). Construct additional right turn lane on I- <br />40 WB Ramp and improve operations at SR 1308 (Garden <br />Road) intersection in Burlington <br />6/20/30 FY2032 $936,000 Planning and design activities <br />pending. (Funded for Prelim. <br />Engineering only) <br />Brandon Green <br />BP7-R023 Replace Bridge #238 on SR 2128 (Old Hillsborough Road)9/18/31 FY2033 $700,000 Planning and design activities <br />underway <br />Daniel Dagenhart <br />BP7-R018 Replace Bridge #254 on SR 2104 (Mandale Road)10/7/32 FY2034 $700,000 Planning and design activities <br />pending <br />Daniel Dagenhart <br />BP7-R019 Replace Bridge #103 on SR 2182 (Perry Road)10/21/32 FY2034 $700,000 Daniel Dagenhart <br />SM-6107D <br />51319 <br />E.M. Holt Elementary School located at 4751 NC 62, <br />Burlington, NC, south of Burlington. Internal campus <br />improvements as identified in Traffic Operations Study SCH-F- <br />2019-074 to contain school-related traffic queues on campus. <br />TBD TBD $750,000 Planning and design activities <br />underway. Work performed by <br />school system with reimbursement <br />by department. Work complete. <br />Waiting on start and completion <br />Brian Thomas <br />Page 2 BGMPO Oct 2024