Browse
Search
OUTBoard Jan 21 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Jan 21 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 4:35:55 PM
Creation date
1/14/2025 4:35:41 PM
Metadata
Fields
Template:
BOCC
Date
1/21/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Agreement ID # 13096 14 <br />CONTRACTOR COMPLIANCE <br />The County will be responsible for ensuring that the contractor complies with all of the terms of <br />the contract and any instructions issued by the Department or FHWA as a result of any review or <br />inspection made by said representatives. <br />CHANGE ORDERS <br />If any changes in the Project plans are necessary, the Department must approve such changes <br />prior to the work being performed. <br />SHOP DRAWINGS <br />Shop Drawings shall be submitted in accordance with the approved plans and specifications and <br />may require review by the Designer. <br />17. CLOSE-OUT <br />Upon completion of the Project, the County shall be responsible for the following: <br />FINAL INSPECTION <br />The County shall arrange for a final inspection by the Department. Any deficiencies determined <br />during the final field inspection must be corrected prior to final payment being made by the <br />Department to the County. Additional inspection by other entities may be necessary in <br />accordance with the Department’s guidelines and procedures. The County shall provide the <br />Department with written evidence of approval of completed project prior to requesting final <br />reimbursement. <br />FINAL PROJECT CERTIFICATION <br />The County will provide a certification to the Department that all work performed for this Project is <br />in accordance with all applicable standards, guidelines, and regulations. <br />18. MAINTENANCE <br />The County, at no expense or liability to the Department, shall assume all maintenance <br />responsibilities for the Orange Grove Road Sidewalk, or as required by an executed <br />encroachment agreement. <br />Docusign Envelope ID: 0E38C765-2C74-4C4A-9A16-40FFB7FB8521
The URL can be used to link to this page
Your browser does not support the video tag.