Orange County NC Website
<br />Agreement ID # 13096 12 <br />AWARDING CONTRACT <br />After the advertisement of the Project for construction bids, the County shall request concurrence <br />from the Department to award the construction contract by submitting a letter along with tabulated <br />bids received depicting Disadvantaged Business Enterprises (DBE) goals, and a resolution <br />recommending award of the Project to the lowest responsible, responsive bidder. The <br />Department will review the submitted information and provide written approval to the County prior <br />to the contract being awarded by the County. <br />DELAY IN PROCUREMENT <br />In the event the Project has not been let to contract within six (6) months after receiving <br />construction authorization from the Department, the County shall be responsible for documenting <br />to the Department justification for project delay and that the Project remains in compliance with <br />the terms of this Agreement, the approved plans and specifications, and current codes. <br />FORCE ACCOUNT <br />Force account work is only allowed when there is a finding of cost effectiveness for the work to be <br />performed by some method other than a contract awarded by a competitive bidding process , or <br />there is an emergency. Written approval from the Department is required prior to the use of force <br />account by the County. Federal Highway Administration regulations governing Force Account are <br />contained in Title 23 Code of Federal Regulations, Part 635.201, Subpart B; said policy being <br />incorporated in this Agreement by reference www.fhwa.dot.gov/legsregs/directives/cfr23toc.htm. <br />North Carolina General Statutes governing the use of Force Account, Chapter 143, Article 8 <br />(Public Contracts) can be found at www.ncleg.net/gascripts/Statutes/Statutes.asp. <br />16. CONSTRUCTION <br />The County, and/or its agents shall construct the Project in accordance with the plans and <br />specifications of the Project as filed with, and approved by, the Department. During the <br />construction of the Project, the procedures set out below shall be followed: <br />CONSTRUCTION CONTRACT ADMINISTRATION <br />The County shall comply with the NCDOT Construction Manual as referenced at <br />http://www.ncdot.org/doh/operations/dp%5Fchief%5Feng/constructionunit/formsmanuals/construc <br />tion/, which outlines the procedures for records and reports that must be adhered to in order to <br />Docusign Envelope ID: 0E38C765-2C74-4C4A-9A16-40FFB7FB8521