Browse
Search
OUTBoard Jan 21 2025
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2025
>
OUTBoard Jan 21 2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 4:35:55 PM
Creation date
1/14/2025 4:35:41 PM
Metadata
Fields
Template:
BOCC
Date
1/21/2025
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Planning Department <br />Transportation Element of Development Review Process <br /> Development <br />Application <br />Development Advisory Council <br />Other <br />Department <br />Review <br />• Soil Erosion/Sediment Control <br />• Economic Development <br />• DEAPR <br />• Etc. <br />Comprehensive <br />Planning <br />Division <br />Traffic Impact <br />Analysis (TIA) 1 <br />Enforce <br />TIA <br />Transportation (MIA) Non-Transportation <br />• Right-of-way reservation <br />• Install turn lane <br />• Install traffic signal <br />• Etc. <br />Locally <br />Adopted Plans <br />Recommended <br />Improvements <br />• Right-of-way reservation <br />• Install turn lane <br />• Install traffic signal <br />• Etc. <br />State Transportation <br />Improvement <br />Program (STIP) <br />Require <br />Right-of-way <br />Dedication <br />DOT TIA <br />Checklist <br />3,000 <br />daily <br />trips <br /> <br />Planned <br />Improvement <br />Yes No <br />CTP/MTP Funded No <br />No action <br />No Yes <br />No action <br />NCDOT <br />Accepts <br />NCDOT <br />Acquires <br />Given Not given <br />Current Planning Division <br />NCDOT <br />NC Streets <br />& <br />Driveway <br />Access <br />Policy OC UDO <br />§6.17 <br />800 <br />daily <br />trips <br /> <br />1 NCDOT reviews site/master plans for on-site and off-site improvements required for approval. DOT may have additional requirements in addition to County <br />requirements. Developer must provide improvements per TIA. <br />Site/Master <br />Plan
The URL can be used to link to this page
Your browser does not support the video tag.