Browse
Search
2025-012-E-AMS-MBP Carolina-Preinspection Commissioning Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-012-E-AMS-MBP Carolina-Preinspection Commissioning Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 2:40:18 PM
Creation date
1/9/2025 2:40:12 PM
Metadata
Fields
Template:
Contract
Date
1/2/2025
Contract Starting Date
1/2/2025
Contract Ending Date
1/2/2025
Contract Document Type
Contract
Amount
$58,800.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Angel Barnes <br />October 28, 2024 <br />Page 1 of 2 <br />MBP <br />4700 Falls of Neuse Road, Suite 370 | Raleigh, North Carolina 27609 | 919-875-0124 - Local | www.mbpce.com <br /> <br /> <br /> <br /> <br />October 28, 2024 <br /> <br />Orange County Government <br />Asset Management Services <br />300 West Tryon Street, Bldg. B, 3rd Floor Office 10 <br />Hillsborough, NC 27278 <br /> <br />Attention: Angel Barnes, Capital Projects Manager <br /> <br />Reference: Whitted Complex HVAC Replacement <br /> Proposal for Pre-Demo Testing, Adjusting, and Balancing <br />(TAB) and Air Distribution System Inspection <br /> <br />Dear Ms. Barnes <br /> <br />MBP Carolinas, Inc. (“MBP”) is pleased to submit this proposal to Orange County (the “County” or <br />“Client”), offering additional services for the Whitted Complex HVAC Replacement project located in <br />Hillsborough, NC (the “Project”). In addition to our commissioning (Cx) services, we propose to include <br />TAB and air distribution system inspection services prior to the demolition phase of the project. This <br />extended scope aims to enhance the overall functionality and efficiency of the HVAC systems. <br /> <br />MBP will partner with MSS Solutions to provide the mechanical systems inspection and The Phoenix <br />Agency, Inc., for testing, adjusting, and balancing services. <br /> <br />SCOPE OF WORK (SOW) <br /> <br />PHASE 1 – TESTING, ADJUSTING, AND BALANCING <br />Airflow Verification at AHU and Distribution Level <br />1. Measurements of total air volume delivered by each air handler. <br />2. Assessment of airflow at VAV terminals and air distribution components. <br />3. If applicable, BAS sensors will be verified for proper placement and calibrated to ensure accurate <br />system monitoring and control. <br />Static Pressure Profile for AHU Systems and Ductwork <br />1. A comprehensive static pressure profile will be generated for the AHUs from intake to supply <br />distribution. This will include static pressure readings at key locations throughout the duct system <br />to ensure duct sizing and configuration are optimized for system performance. <br />Updated Mechanical As-Built Sketch <br />1. An updated mechanical sketch will be developed to identify any discrepancies from the provided <br />construction documents. <br />HYDRONIC SYSTEMS <br />System Flow Testing <br />1. Verification of system flow rates at the pump level to identify pump capacities and any <br />inefficiencies. <br />Docusign Envelope ID: 78DC9625-2DE6-477E-B5E5-6D6E401AE100
The URL can be used to link to this page
Your browser does not support the video tag.