Browse
Search
2025-009-E-Health Dept-Wounded Healers-Opioid prevention in youth
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2025
>
2025-009-E-Health Dept-Wounded Healers-Opioid prevention in youth
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 2:37:20 PM
Creation date
1/9/2025 2:37:10 PM
Metadata
Fields
Template:
Contract
Date
1/2/2025
Contract Starting Date
1/2/2025
Contract Ending Date
1/2/2025
Contract Document Type
Contract
Amount
$55,600.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br />Revised 01/24 <br />Attachment C - Format of Total Project Cost Estimate <br />ORANGE COUNTY <br />Attachment C--- Project Cost Estimate <br />PROJECT <br />IDENTIFICATION: <br />PROJECT CITY or LOCATION: <br />(Definitions/explanations are provided on pg 2 to assist in completion of this <br />form.) <br />CURRENT ESTIMATED CONSTRUCTION COSTS QTY UNIT COST PER UNIT TOTAL <br /> <br />A.Site Preparation <br />1. Demolition $0 <br />2. Site Work $0 <br />B.Construction <br />1. Utility Services $0 <br />2. Building Construction (new space) $0 <br />3. Building Construction (existing) $0 <br />4. Plumbing (new space) $0 <br />5. HVAC (new space) $0 <br />6. Electrical (Includes TV & Radio Studio) $0 <br />7. Fire Supression and Alarm Systems $0 <br />8. Telephone, Data, Video $0 <br />9. Associated Construction Costs $0 <br />10. Other: $0 <br />C.Equipment <br />1. Fixed $0 <br />2. Moveable $0 <br />ESTIMATED CONSTRUCTION COSTS $0 <br />Items below may be calculated by percentage or lump sum. If using lump sum, make entry in $ field. <br />DESIGN FEE %(% of Estimated Construction Costs)$0 <br />PRECONSTRUCTION <br />COSTS %(% of Estimated Construction Costs)$0 <br />CONTINGENCIES %(% of Estimated Construction Costs)$0 <br />ESTIMATED COSTS (% of Estimated Construction Costs + Contingencies + Design Fee)$0 <br />Escalation = percent per month multiplied by number of months <br />(From Est. Date to mid-point of construction) = months % per month <br />ESCALATION COST INCREASE (Total of Estimated Costs x Escalation %)$0 <br />ESTIMATED TOTAL PROJECT COSTS (Estimated Costs + Escalation Cost Increase if any)$0 <br />APPROVED BY: _______________________________________TITLE DATE <br />Docusign Envelope ID: CD6B8E2E-1F22-4A2A-8D72-6C5ADFEB1797
The URL can be used to link to this page
Your browser does not support the video tag.