Browse
Search
Agenda - 12-05-2005-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 12-05-2005
>
Agenda - 12-05-2005-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:36:39 PM
Creation date
8/29/2008 10:41:51 AM
Metadata
Fields
Template:
BOCC
Date
12/5/2005
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20051205
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qrange Ccunty <br />Effective: (date) <br />-DRAFT- <br />Energy Conservation Policy <br />A. General <br />4 <br />Attachment <br />Qrange County's "Environmental Responsibility in County Government" goal includes <br />the objective: Initiate policies and programs that conserve energy, reduce <br />fuel/utility/resource consumption,,." In support of this goal, the County has adopted this <br />Energy Conservation Policy, <br />Energy cost for electricity, natural gas, propane and fuel oil for County facilities is a <br />significant County cast. Beyond this, energy consumption has significant <br />environmental impacts, As a result, it is both necessary and beneficial for the County <br />to adopt a policy of energy conservation and efficiency, <br />Water conservation and vehicle fuel conservation will be addressed in separate <br />policies. <br />B. Purpose <br />The purpose of this policy is to reduce the County government's energy consumption, <br />wherever possible, and improve energy efFciency far that energy that must be used <br />throughout Orange County government buildings, consistent with the need for safe and <br />secure County facilities. <br />C. Policy Goals <br />The policy addresses both short and long term goals, <br />1. Short Term (One tc Two Years) <br />Establish the policy foundation of responsibilities, planning, programs, standards, <br />performance measures and the like to manage the Ccunty government's energy <br />use and conserve energy, <br />Manage energy and other utility consumption to minimize use to the greatest <br />extent passible while maintaining safe and acceptable work conditions, <br />• Achieve a reduction in average energy consumption per square foot annually, <br />2. Long Term (Three Years or More) <br />Incorporate energy conservation and efficiency systems, techniques and design in <br />all major renovations, system replacements and new constnaction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.