Browse
Search
OTHER-2024-100-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract
OrangeCountyNC
>
Board of County Commissioners
>
Various Documents
>
2020 - 2029
>
2024
>
OTHER-2024-100-Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:08:30 PM
Creation date
12/18/2024 3:07:22 PM
Metadata
Fields
Template:
BOCC
Date
11/19/2024
Meeting Type
Business
Document Type
Others
Agenda Item
8-g
Document Relationships
Agenda - 11-19-2024; 8-g - Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and Approval of Budget Amendment #3-B
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-19-2024 Business Meeting
Agenda for November 19, 2024 BOCC Meeting
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 11-19-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID : 5C13EB23- 106D -4043-A83D -8216292668A0 0'� 171 _ D ® t j � t `1 <br /> [ Departmental Use Only] <br /> TITLE Ice Rink Chiller & Cool Tower <br /> FY 2024 -2025 RFP RC2022 - 1001 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER $250 , 000 . 00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement") , made as of the 20th day of <br /> November, 2024 , by and between Brady Services , Inc , (hereinafter called the " Contractor") , and Orange <br /> County, a political subdivision of the State of North Carolina, (hereinafter called the " County, " " Orange <br /> County, " or " Owner") , <br /> WITNESSETH . <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows : <br /> 1 . CONTRACT DOCUMENTS ; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals , designer approved communications and field <br /> orders , the Proposal , Construction Documents and Drawings and Written Specifications . The Contract <br /> Documents form the Contract. In the event of any inconsistency between or among the Contract Documents <br /> the Contract Documents shall be interpreted in the following order of priority : <br /> a . This Agreement and incorporated General Conditions attached as Exhibit 1 . <br /> b . Designer approved and stamped construction documents and drawings and written <br /> specifications . <br /> i <br /> c . Designer approved communications and field orders . <br /> d. Request for Proposals and addenda thereto . <br /> e . Proposal . <br /> 2 . SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials , and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice4o -Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents , <br /> which are made a part hereof as if fully contained herein : <br /> a . Construction Drawings prepared by Progressive Design Collaborative, LTD (Sheet G1 . 01 , <br /> M0 . 00 , M0 . 01 , M1 . 019 M5 . 011 M5 . 02 , M6 . 01 , MTOI1 E0 . 005 E0 . 01 , E1 . 01 , E5 . 01 dated May <br /> 10 , 2024) <br /> b . Written specifications prepared by the Designer . <br /> c . Brady Services , Inc . proposal dated November 5 , 2024 which fully describes the work to be <br /> Revised 01 / 24 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.