Browse
Search
2024-751-E-Emergency Svc-Motorola Solutions-VHF Paging System Upgrades
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-751-E-Emergency Svc-Motorola Solutions-VHF Paging System Upgrades
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 3:43:44 PM
Creation date
12/12/2024 3:43:27 PM
Metadata
Fields
Template:
Contract
Date
11/21/2024
Contract Starting Date
11/21/2024
Contract Ending Date
12/6/2024
Contract Document Type
Contract
Amount
$494,300.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, North Carolina <br />VHF Paging System Upgrades <br />July 19, 2024 <br />Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br />Motorola Solutions Confidential Restricted Statement Of Work 1-9 <br /> <br />1.9.4 Finalize Documentation <br />Motorola Responsibilities: <br />• Provide an electronic as-built system manual on a shared drive. The documentation will include <br />the following: <br />− System-Level Diagram <br />− Site Block Diagrams <br />− Site Floor Plans <br />− Site Equipment Rack Configurations <br />− ATP Test Checklists <br />− Functional Acceptance Test Plan Test Sheets and Results <br />− Equipment Inventory List <br />Orange County Responsibilities: <br />• Receive and approve all documentation provided by Motorola. <br />Completion Criteria: <br />• All required documentation is provided and approved by the Customer. <br /> <br />1.9.5 Final Acceptance (Milestone) <br />• All deliverables completed, as contractually required. <br />• Final System Acceptance received from the Customer. <br /> <br />PROJECT ADMINISTRATION <br />1.10.1 Project Status Meetings <br />Motorola Responsibilities: <br />• Motorola Project Manager, or designee, will attend all project status meetings with the Customer, <br />as determined during the CDR. <br />• Record the meeting minutes and supply the report. <br />• The agenda will include the following: <br />− Overall project status compared to the Project Schedule. <br />− Product or service related issues that may affect the Project Schedule. <br />− Status of the action items and the responsibilities associated with them, in accordance with <br />the Project Schedule. <br />− Any miscellaneous concerns of either the Customer or Motorola. <br />Orange County Responsibilities: <br />• Attend meetings. <br />• Respond to issues in a timely manner. <br />Completion Criteria: <br />• Completion of the meetings and submission of meeting minutes. <br />Docusign Envelope ID: A05892FB-E22F-4F9D-8892-114F73CBF1B7Docusign Envelope ID: 8FA7D053-A257-4BCD-BB7E-4DF984B26C6A
The URL can be used to link to this page
Your browser does not support the video tag.