Browse
Search
2024-751-E-Emergency Svc-Motorola Solutions-VHF Paging System Upgrades
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-751-E-Emergency Svc-Motorola Solutions-VHF Paging System Upgrades
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 3:43:44 PM
Creation date
12/12/2024 3:43:27 PM
Metadata
Fields
Template:
Contract
Date
11/21/2024
Contract Starting Date
11/21/2024
Contract Ending Date
12/6/2024
Contract Document Type
Contract
Amount
$494,300.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County, North Carolina <br />VHF Paging System Upgrades <br />July 19, 2024 <br />Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br />Motorola Solutions Confidential Restricted Statement Of Work 1-7 <br /> <br />• Create site evaluation report to verify site meets or exceeds requirements, as defined in <br />Motorola’s Standards and Guidelines for Communication Sites (R56). <br />Orange County Responsibilities: <br />• Provide access/escort to the sites. <br />• Witness tests if desired <br />Completion Criteria: <br />• All R56 audits completed successfully. <br /> <br />1.8.6 Perform Equipment Testing <br />Motorola Responsibilities: <br />• Test individual components of the system to verify compliance to the equipment specifications. <br />• Repeat any failed test(s) once Motorola (or the Customer) has completed the corrective action(s). <br />• Prepare documentation of component tests to be delivered as part of the final documentation <br />package. <br />Orange County Responsibilities: <br />• Witness tests if desired. <br />Completion Criteria: <br />• Successful completion of equipment testing. <br /> <br />1.8.7 Perform Functional Testing <br />Motorola Responsibilities: <br />• Verify the operational functionality and features of the individual subsystems and the system <br />supplied by Motorola, as contracted. <br />• If any major task as contractually described fails, repeat that particular task after Motorola <br />determines that corrective action has been taken. <br />• Document all issues that arise during the acceptance tests. <br />• Document the results of the acceptance tests and present to the Customer for review. <br />• Resolve any minor task failures before Final System Acceptance. <br />Orange County Responsibilities: <br />• Witness the functional testing. <br />Completion Criteria: <br />• Successful completion of the functional testing. <br />• Customer approval of the functional testing. <br /> <br />1.8.8 System Acceptance Test Procedures (Milestone) <br />• Customer approves the completion of all the required tests. <br />Docusign Envelope ID: A05892FB-E22F-4F9D-8892-114F73CBF1B7Docusign Envelope ID: 8FA7D053-A257-4BCD-BB7E-4DF984B26C6A
The URL can be used to link to this page
Your browser does not support the video tag.