Browse
Search
Agenda - 05-04-2004-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 05-04-2004
>
Agenda - 05-04-2004-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:41:21 PM
Creation date
8/29/2008 10:41:50 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2004
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20040504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />Development of the Euliss Property as the proposed <br />West Ten Soccer Center <br />Orange County desires to enter into a contractual agreement with Corley Redfoot Zack <br />for the purpose of receiving consulting services for the design of this project, Orange <br />County proposes to include in the agreement, the items listed below, <br />Scope of the Project: <br />• Create a Master Plan for the soccer center (design level of park conceptual <br />plan), with special attention to synergies and potential economies of scale <br />with the adjoining school site. <br />• Conduct and Coordinate necessary site evaluation, testing and permitting. <br />• Assist with a public meeting to receive input on the proposed plan. <br />• Develop cost estimates for each separate program element of the project. <br />• Present final draft of the proposed plan to the Board of County <br />Commissioners by June 8 or at the latest, June 24`s. <br />• Prepare and revise all necessary site plans (including grading, mechanical, <br />layout, etc.) and subsequent construction drawings and specifications. <br />• Develop and prepare all necessary contract documents. <br />• Assist with construction management (hourly), to the degree indicated in <br />subsequent discussions. <br />• Coordinate process requirements to align with the school project timeline. <br />• Assistance as needed throughout the project, as design liaison between <br />Orange County and Orange County Board of Education. <br />Program Elements of the project are: <br />• Design for the maximum number of full size soccer fields (360' x 225') that <br />the site can yield, within design and development standard parameters. <br />• Smaller (Ul l or younger) fields if space allows. <br />• One field designed as a championship field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.