Browse
Search
2024-745-E-Emergency Svc-Motorola Solutions-Emergency Radio Response Coverage System BDA in K-12 Public Schools Phase 2
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-745-E-Emergency Svc-Motorola Solutions-Emergency Radio Response Coverage System BDA in K-12 Public Schools Phase 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 3:40:24 PM
Creation date
12/12/2024 3:40:11 PM
Metadata
Fields
Template:
Contract
Date
11/22/2024
Contract Starting Date
11/22/2024
Contract Ending Date
12/6/2024
Contract Document Type
Contract
Amount
$1,264,317.07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUOTE-2735184 <br />Orange County Schools - BDA Phase <br />2 <br />Any sales transaction following Motorola's quote is based on and subject to the terms and conditions of the valid and executed written contract between Customer and Motorola (the <br />""Underlying Agreement"") that authorizes Customer to purchase equipment and/or services or license software (collectively ""Products""). If no Underlying Agreement exists between <br />Motorola and Customer, then Motorola's Standard Terms of Use and Motorola's Standard Terms and Conditions of Sales and Supply shall govern the purchase of the Products. <br />Motorola Solutions, Inc.: 500 West Monroe, United States - 60661 ~ #: 36-1115800 <br />14 <br /> <br /> <br /> <br />• J-hooks will be used to support the coaxial cable above the ceiling. <br />• Riser Space between floors is available. Coring between floors and/or vertical roof penetrations are not <br />required and is excluded from the quotation. <br />• The customer must provide any roof penetration for donor antennas. Any sidewall penetrations will be <br />completed by MCA/MSI. <br />• The design does not account for coax and/or fiber to not be installed in conduit and does not include <br />installation of cable tray nor raceway. <br />• Adequate Electrical Service and Grounding are available within 6' of the active equipment locations. <br />• Installation services will be conducted during normal business hours (8 am to 5 pm, Monday through Friday). <br />• Patching and painting not included in quotation- access panels s hould be available for access to the <br />ceiling. <br />• Any damage after installation caused by other trades will result in a change order. <br />• As-builts and submittal packages including benchmark results will be provided to the owner at the <br />completion of the project. <br />• All indoor coax & fiber installed in plenum space is plenum rated. No coaxial or fiber cable in this quotation is <br />rated for burn survivability nor installed in conduit. For burn survivability and conduit, please request a re- <br />quote. <br />• The Proposed Solution only includes 700/800 MHz channels, additional frequency bands or changes through <br />add/ deletion or P25 Upgrades may require the equipment to be reprogrammed. <br />• Facility Owner is responsible for all cabling & conduit between DAS and Fire Alarm Panel and is excluded from <br />this budgetary quotation. <br />• Fire Alarm interface and programming provided by others and are not included in the quotation. Dry contacts <br />for Public Safety DAS equipment are provided only. <br />• The venue is responsible to have Fire Alarm Control Panel Relay delivered to within 3' of the PS Repeater and <br />BBU. <br />• The design is based on -95 dBm RSSI over 95% of the coverage area. <br />• The design is based on -95 dBm RSSI over 99% of critical areas as defined by local NFPA requirements. <br />• Design is based on the fact that a grid test consisting of 20 measurements per floor will be acceptable for <br />final inspection results per NFPA requirements. <br />• Dry contacts will be available for the Fire Alarm interface per IFC section 510- Any additional contacts will <br />result in a change order <br />• Quotation includes GROL-certified Engineers and installation staff as required by the local jurisdiction. <br />• Phasing is not included in the quotation. This quote is bases on work being completed in 1 deployment. <br />Any additional phasing requirements/trips will result in a change order. Any canceled PO's are subject to <br />an equipment restocking fee and any unreturnable equipment due to canceled PO will be invoiced at full <br />cost. <br />● Unless otherwise noted, this quote excludes sales tax or other applicable taxes (such as Goods and Services <br />Tax, sales tax, Value Added Tax and other taxes of a similar nature). Any tax the customer is subject to will be <br />added to invoices. <br />Docusign Envelope ID: 10B45E23-5352-46A3-9DFE-5DE93928E64C
The URL can be used to link to this page
Your browser does not support the video tag.