Orange County NC Website
  <br /> <br /> Page 4 <br /> <br /> <br />2. Includes mobile app for Android or iOS connectivity, enhanced for small screen viewing <br />3. Simple chiller graphic <br />4. Provide BACnet MS/TP wiring for communications between new Tracer UC Series <br />BACnet controllers and new Tracer SC+ <br />5. Provide BACnet IP or discrete outputs for status of the chiller and loading. <br />2. Chilled water system - Air cooled chiller (Quantity 1) <br />1. Wire the chiller flow switch <br />2. Wire to the BACnet interface for the chiller <br />3. Provide a hard wired interlock with the primary pump <br />4. Install an SC+ in the chiller plant with a UC600 for miscellaneous point control <br />5. Provide and wire to an isolation valve <br />3. Provide one year of remote monitoring and chiller reporting <br />Test and Balance <br />1. Pre-testing prior to construction on existing equipment and final testing on new equipment. <br />Ceilings <br />1. Install new ceiling grid and tile in mechanical room <br /> Professional and Specialty Services <br />1. Pull all required permits with the local AHJ <br />2. Provide in-house commissioning and quality assurance <br />3. Provide support to owner’s third-party commissioning agent <br />4. Provide factory startup of chiller <br />5. Provide shop drawings <br />6. Coordinate with PDC Engineering to support as-built drawings and specifications. <br />General Requirements <br />1. Provide payment and performance bonds <br />2. Provide project management, project administration and dedicated job site superintendent. <br />3. Provide portable toilets. <br />4. Provide dumpsters <br />5. Provide parking lot closure flagging and barricades <br /> <br />Docusign Envelope ID: 5C13EB23-106D-4043-A83D-8216292668A0