Browse
Search
2024-743-E-AMS-Brady Services-Sportsplex Ice Rink Chiller & Cooling Tower Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-743-E-AMS-Brady Services-Sportsplex Ice Rink Chiller & Cooling Tower Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 3:39:03 PM
Creation date
12/12/2024 3:38:59 PM
Metadata
Fields
Template:
Contract
Date
11/23/2024
Contract Starting Date
11/23/2024
Contract Ending Date
11/26/2024
Contract Document Type
Contract
Amount
$1,600.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Page 2 <br /> <br /> <br />Scope of Work Overview <br />New HVAC Equipment <br />1. (1) 250 nominal ton air-cooled screw chillers, model ACRC <br />1. 460 Volt/60Hz/3Phase <br />2. InvisiSound Superior Package - Sound Power: 102dBA, Sound Pressure: 74dBA <br />3. UL Listed / ASME Pressure Vessel Code / ASHRAE 90.1/C743 2019 – Compliant <br />4. Refrigerant Charge R513A <br />5. Low Temp Cooling <br />6. 2-Pass Evaporator, Evaporator Standard Tube <br />7. 40% Ethylene Glycol <br />8. Grooved Pipe Connection <br />9. Flow Switch Set Point 15cm/sec <br />10. Evaporator only insulation for high humidity/low evap temp 1.25 inch <br />11. Wide Ambient <br />12. 6V Condenser Coil Modules, Aluminum Micro Channel, EC Condenser Fan Motors <br />13. Factory Installed Harmonic Filters for IEEE519 5% TDD <br />14. Single point connection main line unit power-ancillary items require other power <br />15. Circuit Breaker w/ High Fault Rated Control Panel – 65,000A SCCR, High Short Circuit <br />Rating <br />16. 20A - 115V Convenience Outlet (Requires separate 120V/1ph power connection) <br />17. BACnet MS/TP Interface <br />18. Hard Wired relays <br />19. Architectural Louvered Panels / Condenser Coil Guards <br />20. Elastomeric Isolators (Field Installed) - Special spring isolators are not included <br />21. 5-year whole unit parts and labor warranty <br />2. Pumps <br />1. Install 1 new chilled water pump (BP-1) and new VFD <br />2. Install 1 redundant chilled water pump (BP-2) and new VFD <br />3. Install glycol management system <br />Demolition <br />1. Demolish existing ammonia chillers and remove from site. <br />1. Reclaim ammonia from chiller and dispose of according to OSHA standards. <br />2. Demolish existing cooling tower and remove from site. <br />Docusign Envelope ID: 5C13EB23-106D-4043-A83D-8216292668A0
The URL can be used to link to this page
Your browser does not support the video tag.