Orange County NC Website
1. No comments received. <br /> NCDOT Date: 10/15/24 Staff: <br />David Genwright <br />Digenwright@ncdot.gov <br />336-570-6833 <br />1. With no proposed roads, no proposed utilities in the right of way, low expected <br />change in daily trips count, low expected traffic impacts, and this proposal not <br />being connected to a state-maintained road, no NCDOT action or approval is <br />required. <br /> Planning Date: 10/14/24 Staff: <br />Lauren Honeycutt <br />lahoneycutt@orangecountync.gov <br />919-245-2598 <br />1. Staff comments will be provided by Planning for the Board of Adjustment agenda packet. <br />During this review, staff will evaluate the Variance request based on the standards within <br />UDO Section 2.10 Variances. <br />2. Property is located within Upper Eno Critical Watershed and will be restricted to 8,921 <br />sq. ft. of impervious surface based on the sliding scale found in UDO Tables 4.2.5.2 & <br />4.2.5.3. <br />3. Should a Variance be granted, any structures shall still adhere to the Agricultural <br />Residential Zoning District building setbacks of 40’ from the front property line and 20’ <br />from the side and rear lines. <br /> Solid Waste Date: Staff: <br />Matt Taylor <br />mtaylor@orangecountync.gov <br />919-918-4905 <br />1. No Comment. <br /> Stormwater <br />Management Date: Staff: <br />Christopher Sandt <br />csandt@orangecountync.gov <br />919-245-2583 <br />1. The project is located in the Upper Eno Critical Watershed Overlay District. Stormwater <br />Management is required if the proposed Land -Disturbing Activity exceeds 21,780 square <br />feet. NOTE: Land disturbance thresholds are cumulative to parent tract and will <br />carry over to any/all subdivided lots. <br /> <br /> Transportation <br />Services Date: 10/15/24 Staff: <br />Darlene Weaver <br />dweaver@orangecountync.gov <br />919-245-2002 <br />1. No comment <br />30