Browse
Search
12.11.24 BOA Agenda Packet
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2024
>
12.11.24 BOA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2024 4:40:17 PM
Creation date
12/6/2024 4:38:06 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2024
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />This is a separate attachment with this e-mail. <br /> <br />6. Please include statement indicating the anticipated development schedule (UDO Section <br />2.7.3(B)(9)). This can be addressed in the narrative and, to an extent, already has but <br />needs to be explicitly addressed. <br /> <br />This is addressed more fully in the revised narrative (separate attachment with this e-mail). <br /> <br />Site Plan <br /> <br />Note: a revised site plan addressing the following concerns is submitted as a separate <br />attachment with this e-mail. <br /> <br />1. Please include statement (preferably on-site plan) noting method of disposal of trees, <br />limbs, stumps, and construction debris associated with the permitted activity (UDO <br />Section 2.7.3(B)(8)). <br /> <br />Any trees that will be removed will be done in accordance with Orange County regulations and <br />disposal of subject trees and stumps will comply with Orange County solid waste management <br />regulations. <br /> <br />2. Site plan to be updated to reflect all parcels subject to proposed Special Use Permit. <br /> <br />The subject parcel is included (Parcel PIN: 9883-30-4125). <br /> <br />3. Please provide survey of property detailed on Sheet L-1.0 as a separate sheet for better <br />review. Survey will acceptably address UDO Section 2.5.3(A) and 2.5.3(E). <br /> <br />Refer to sheet L-1.01 of site plan for separate survey (with GIS topo and existing conditions) <br />with boundary of the subject parcel shown in red. Survey is from Freehold Land Surveyors. <br />Internal parcel line does not have metes and bounds since this is part of the larger TLC Brumley <br />property. <br /> <br />4. Please provide separate sheet to address UDO Section 2.5.3(D): zoning of property, <br />zoning of all adjacent properties, and existing land uses on adjacent properties. <br /> <br />Refer to L1.0 of site plan. <br /> <br />5. Site plan acreage/summary data to be updated to reflect all parcels subject to Camp use <br />proposal. <br /> <br />The site plan for the Schoolhouse of Wonder site is located on the subject parcel but since the <br />activities are limited to Schoolhouse children, this is shown in a polygon depicted by orange <br />dashed line and hatched. The primary activities are contained within this smaller site plan area. <br />This polygon represents ~12.01 acres. <br />109
The URL can be used to link to this page
Your browser does not support the video tag.