Orange County NC Website
Attachment 6A <br /> <br />Development Schedule Section <br />2.7.3(B)(9) <br />Exhibit B – Narrative of <br />Proposed Use (Attachment 1) 2 <br />Extended Vesting Request Section <br />2.7.3(B)(10) <br />An additional 6 month vesting <br />period was requested by the <br />applicant. This would extend <br />the 12 month timeframe within <br />which construction is to <br />commence as specified in UDO <br />Section 2.7.11(D) <br />24 <br />Submittal Requirements <br /> <br />Section 5.6.8 Application (Attachment 1) <br /> 2, 14 <br />REQUIREMENT UDO SUPPORTING EVIDENCE FOF <br />Notification Requirements for all Evidentiary Hearings <br />Mailed Notice all adjacent <br />property owners (at least 10 <br />days but no more than 25 days <br />prior) <br />Sections <br />2.7.5(B) and <br />2.7.6(A)(1) <br />NIM and BOA Materials (Attachments 3 <br />& 4) <br />NIM notices mailed by applicant <br />September 11, 2024 prior to September <br />26 NIM. <br />BOA Public Hearing Notices mailed by <br />staff on October 29, 2024. Certification <br />available in Attachment 4. <br />8, 9 <br />Sign Posting on Property (at <br />least 10 days prior) <br />Sections <br />2.7.5(D) and <br />2.7.6(A)(2) <br />NIM and BOA Materials (Attachments 3 <br />& 4) <br />NIM signs posted by applicant on <br />September 12, 2024 prior to September <br />26 NIM. <br />BOA signs posted by staff on October <br />29, 2024. Certification available in <br />Attachment 4. <br />10 <br />REQUIREMENT UDO SUPPORTING EVIDENCE FOF <br />Waste, Safety and Access Requirements for all SUPs <br />Waste Disposal <br />Method and adequacy of <br />provision for sewage disposal <br />Section <br />5.3.2(B)(1) Exhibit C – Site Plan of the Application <br />(Attachment 1) 2, 11