Orange County NC Website
16 <br /> 1 Slide #10 <br /> Plan Recommendations <br /> • Example <br /> AL Stanback Middle <br /> project I D R—m—nd.U.. Is..Addressed Need <br /> la Add traffic calming 7affi—significant long <br /> High <br /> measures,such as NC 06 and poses a safety <br /> e#ending the school sone barrier for cyclists and <br /> further south and reducing pedestrians. <br /> the speed limit from 45 <br /> mph to 35 mph throughout <br /> the schoel zone. <br /> Ile Add a high visibility Benton Drive and NC 96 Medium <br /> crosswalk a id pedestrian presents a key crossing <br /> ossing sig nage to NC 86 issue for cyclists and <br /> and Benton Drive. pedestrians. <br /> Ic Add 35 mlles cf sid—tk The lack of bicycle and Medium <br /> and 4"paved shoulders,a pedestrian infrastructure <br /> bicycle lane,or a shared- along NC 66 presents key <br /> use path along NC 36 from infrastructure gaps for _ <br /> Hillsborough's northern cyclists and pedestrians, <br /> town limit to south of Neo <br /> Hope Church Road. <br /> Id Add O.1 miles of sidewalk The lack of bicycle and Medium <br /> ora shared-use path along pedestrian infrastructure <br /> Benton Drive. along Benton Drive <br /> presents key infrastructure <br /> gaps for cyclists and <br /> pedestrians. <br /> le Add 0.1 miles of sidewalk The lack of bicycle and Medium <br /> or a shared-use path along pedestrian infrastructure <br /> Storey Lanealong and Storey Lane <br /> presents key infrastructure <br /> gaps for cyclists and <br /> pedestrians -e•mm sa�.r. <br /> am,.,®aaan�urc <br /> 2 <br /> 3 <br /> 4 Slide #11 <br /> Plan Recommendations - Funding <br /> Federal <br /> Highway Safety Improvement Program(HSIP) <br /> Surface Transportation Block Grant(STSG) <br /> Safe Streets and Roads for All(SS4A) <br /> Carbon Reduction Program <br /> State and Local <br /> • NCDOT Safe Routes to School <br /> • Scholl District Budget <br /> Staff will also work with NCDOT for SPOT Safety/Mobility, resurfacing, bridges, etc. <br /> And other locally administrative processes as they become available <br /> 5 <br /> 6 Nishith Trivedi said by having a plan, the county can use this information to seek grants <br /> 7 for implementing projects. <br /> 8 <br /> 9 <br />