Orange County NC Website
Recomme Total <br /> Rank Applicant Project Name Project Summary Amount nded Score <br /> Name Requested Funding (out <br /> level of 26) <br /> Town of Chapel LED Lighting Purchase and installation of new LED light <br /> Hill Upgrade for fixtures to replace the existing, less <br /> Hargraves efficient metal halide fixtures at the <br /> Community Center Hargraves Community Center outdoor <br /> 13 Basketball Court basketball court $35,000 $0 16.6 <br /> Carolina 1.Video Vignettes 1. Production of bilingual videos on climate <br /> Advocates for of Climate Health health to be used in clinical practice;2. <br /> Climate, Health Principles in Planning for solar arrays to offset energy <br /> and Equity Clinical Practice;2. costs through renewable energy credits for <br /> Solar Arrays and medically high-risk patients <br /> Energy Offsets for <br /> Medically High-Risk <br /> Residents <br /> 15 $64,850 $0 15.2 <br /> Parker Farm Carbon Transition 60 acres of intensively tilled row- <br /> and Vineyard Sequestration cropped tobacco into permanent <br /> through Pasture pasturelands for regenerative grazing <br /> 16 Establishment $39,085 $0 15.1 <br /> Town of Enhancing Installation of two rain gardens in Dr. <br /> Carrboro Resilience and Martin Luther King,Jr. Park to manage <br /> Biodiversity: Rain stormwater runoff,enhance local <br /> Gardens at Dr. biodiversity,and contribute to education <br /> Martin Luther King, and outreach <br /> 17 Jr. Park $50,000 $0 14.7 <br /> One Soil Farm Electric Vehicle and Electric vehicle and EV charger for produce <br /> EV Charger for delivery <br /> 18 Produce Delivery $50,000 $0 14.7 <br /> The ArtsCenter The ArtsCenter Installation of NFRC UV ray blocking films <br /> Energy Efficiency on all eastern and western exposure <br /> 19 Initiative windows $10,000 $0 14.3 <br /> Kolibri Farm Cultivation, Purchase of multiple electric appliances for <br /> Cooking and kitchen,powered by solar array,as well as <br /> Community seeds, mower and drill for community <br /> 20 garden $60,077 $0 14.0 <br /> Spring Crest Solar Well Pump Installation of solar well in remote area to <br /> Farms System reduce GHG and provide water for cattle <br /> 21 $18,000 $0 12.4 <br /> Blawesome Sun Smart: Installation of cold storage protective <br /> Functional Shade structure around existing cold storage unit <br /> Structure for to enhance its functionality and energy <br /> Energy-Efficient efficiency <br /> 22 Cold Storage $15,000 $0 11.9 <br /> The ArtsCenter The ArtsCenter Installation of 20'x 30'pollinator garden, <br /> Sustainable two commercial grade rain barrels,a tri- <br /> Landscape Project section compost bin and bird feeding <br /> 23 station $33,000 $0 11.2 <br /> Botanist and Rural Electric Installation of a 2 port Level 2 EV charging <br /> Barrel Vehicle Charging station at a commercial site in Cedar Grove <br /> 24 Station $12,000 $0 9.8 <br /> Fiori Hill- Floating Wetlands Purchase floating wetlands and plants as <br /> Homeowner's in Fiori Hill part of SCM designed to sequester carbon, <br /> Association SCM/Koi Pond reduce algal growth,and eliminate the <br /> 25 need for an aeration system $7,000 $0 9.0 <br /> Total Requested: Total: <br /> $1,151,873 $262,500 <br />