Browse
Search
Agenda - 12-10-2024; 6-b - Community Climate Action Grant (CCAG) – FY 2024-25 Project Selection
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 12-10-2024 Business Meeting
>
Agenda - 12-10-2024; 6-b - Community Climate Action Grant (CCAG) – FY 2024-25 Project Selection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2024 2:07:50 PM
Creation date
12/5/2024 2:12:42 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-b
Document Relationships
Agenda for December 10, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 12-10-2024 Business Meeting
OTHER-2024-109-Approval of Memorandum of Understanding-MOU-Orange County Partnership to end homelessness
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
RES-2024-068-REFUND-RELEASE RESOLUTION
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-069-REFUND-RELEASE RESOLUTION
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recomme Total <br /> Rank Applicant Project Name Project Summary Amount nded Score <br /> Name Requested Funding (out <br /> level of 26) <br /> Town of Chapel LED Lighting Purchase and installation of new LED light <br /> Hill Upgrade for fixtures to replace the existing, less <br /> Hargraves efficient metal halide fixtures at the <br /> Community Center Hargraves Community Center outdoor <br /> 13 Basketball Court basketball court $35,000 $0 16.6 <br /> Carolina 1.Video Vignettes 1. Production of bilingual videos on climate <br /> Advocates for of Climate Health health to be used in clinical practice;2. <br /> Climate, Health Principles in Planning for solar arrays to offset energy <br /> and Equity Clinical Practice;2. costs through renewable energy credits for <br /> Solar Arrays and medically high-risk patients <br /> Energy Offsets for <br /> Medically High-Risk <br /> Residents <br /> 15 $64,850 $0 15.2 <br /> Parker Farm Carbon Transition 60 acres of intensively tilled row- <br /> and Vineyard Sequestration cropped tobacco into permanent <br /> through Pasture pasturelands for regenerative grazing <br /> 16 Establishment $39,085 $0 15.1 <br /> Town of Enhancing Installation of two rain gardens in Dr. <br /> Carrboro Resilience and Martin Luther King,Jr. Park to manage <br /> Biodiversity: Rain stormwater runoff,enhance local <br /> Gardens at Dr. biodiversity,and contribute to education <br /> Martin Luther King, and outreach <br /> 17 Jr. Park $50,000 $0 14.7 <br /> One Soil Farm Electric Vehicle and Electric vehicle and EV charger for produce <br /> EV Charger for delivery <br /> 18 Produce Delivery $50,000 $0 14.7 <br /> The ArtsCenter The ArtsCenter Installation of NFRC UV ray blocking films <br /> Energy Efficiency on all eastern and western exposure <br /> 19 Initiative windows $10,000 $0 14.3 <br /> Kolibri Farm Cultivation, Purchase of multiple electric appliances for <br /> Cooking and kitchen,powered by solar array,as well as <br /> Community seeds, mower and drill for community <br /> 20 garden $60,077 $0 14.0 <br /> Spring Crest Solar Well Pump Installation of solar well in remote area to <br /> Farms System reduce GHG and provide water for cattle <br /> 21 $18,000 $0 12.4 <br /> Blawesome Sun Smart: Installation of cold storage protective <br /> Functional Shade structure around existing cold storage unit <br /> Structure for to enhance its functionality and energy <br /> Energy-Efficient efficiency <br /> 22 Cold Storage $15,000 $0 11.9 <br /> The ArtsCenter The ArtsCenter Installation of 20'x 30'pollinator garden, <br /> Sustainable two commercial grade rain barrels,a tri- <br /> Landscape Project section compost bin and bird feeding <br /> 23 station $33,000 $0 11.2 <br /> Botanist and Rural Electric Installation of a 2 port Level 2 EV charging <br /> Barrel Vehicle Charging station at a commercial site in Cedar Grove <br /> 24 Station $12,000 $0 9.8 <br /> Fiori Hill- Floating Wetlands Purchase floating wetlands and plants as <br /> Homeowner's in Fiori Hill part of SCM designed to sequester carbon, <br /> Association SCM/Koi Pond reduce algal growth,and eliminate the <br /> 25 need for an aeration system $7,000 $0 9.0 <br /> Total Requested: Total: <br /> $1,151,873 $262,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.