Orange County NC Website
48 <br /> Timeline <br /> This implementation can be completed within approximately three (3) months from delivery of Tablet's at <br /> Licensee assuming Novus DR is already in operational use. During the operational review, a project plan <br /> will be prepared for each Software module. <br /> Assumptions <br /> The key assumptions that TripSpark has employed while determining the level of effort involved with this <br /> implementation are presented below: <br /> • Software will be delivered 'off-the-shelf'. <br /> • The Google map data set embedded in Android will be used for DriverMate. <br /> • Microsoft SQL will be used for the database <br />