Orange County NC Website
53 <br /> Orange County FTTP Project Schedule (6370 HHs) <br /> im Ork- <br /> ... Jan <br /> Director Network <br /> Project Planning Planning <br /> Director OSP <br /> Site Surveys Engineering <br /> Director OSP <br /> Easement Research Engineering <br /> Director IP <br /> Design Engineering Engineering <br /> Director OSP <br /> Permit Acquisition Engineering <br /> Director OSP <br /> OSP Fiber Build Construction <br /> Director OSP <br /> Site Preparation Engineering <br /> Director IP <br /> Equip Installation Engineering <br /> Director OSP <br /> Fiber Terminal Installs&Splicing Construction <br /> Director OSP <br /> Commercial Power Activation Engineering <br /> Director IP <br /> Equip Turn-up Engineering <br /> Directors IP&OSP <br /> Phase 1 Market Launch(1, Engineering <br /> Directors(IP&OSP) <br /> Phase 2 Market Launch(+1,000 Homes) Engineering <br /> Directors(IP&OSP) <br /> Phase 3 Market Launch(+1,000 Homes) Engineering <br /> Directors(IP&OSP) <br /> Phase 4 Market Launch(+1,000 Homes) Engineering <br /> Directors lip&OSP <br /> Phase 5 Market Launch(+1,000 Homes) Engineering <br /> Directors lip&OSP <br /> Phase 6 Market Launch(+1,370 Homes) Engineering <br /> —Project Schedule based on Contract executed as of April 26,2022 <br />