Browse
Search
Agenda - 12-10-2024; 6-a - Authorize Notification Regarding Potential Change in Student Projection Methodology Used by the Schools Adequate Public Facilities Ordinance Technical Advisory Committee
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 12-10-2024 Business Meeting
>
Agenda - 12-10-2024; 6-a - Authorize Notification Regarding Potential Change in Student Projection Methodology Used by the Schools Adequate Public Facilities Ordinance Technical Advisory Committee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2024 2:07:34 PM
Creation date
12/5/2024 1:54:04 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda for December 10, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 12-10-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> Land use study: Enrollment Factors <br /> ■ Transportation Accessibility <br /> ■ 1-40 Widening Project— Improved access to Durham, RTP, and Triad <br /> ■ S. Churton Street Widening— Improved access to Chapel Hill and Hillsborough <br /> ■ Hillsborough Train Station — Establish passenger rail service <br /> ■ Chapel Hill Bus Rapid Transit (BRT)— Establish dedicated bus lanes <br /> ■ Industrial Development <br /> ■ Buckhorn Economic Development District <br /> ■ Demand for Life Sciences &Advanced Manufacturing: Thermo Fisher Scientific <br /> ■ Proximity to the Megasites: VinFast, Wolfspeed, Greensboro Randolph Toyota <br /> ■ Residential Growth <br /> ■ Widespread growth in multiple regions of the district <br /> ■ "Vertical" high-density infill growth in southern Orange <br /> ■ "Horizontal" growth into vacant sites in central and western Orange <br /> ■ Water & Sewer <br /> ■ Overall robust infrastructure, though wastewater capacity limitations in some areas <br />
The URL can be used to link to this page
Your browser does not support the video tag.