Orange County NC Website
38 <br /> Task 3: Multimodal Hub Site and Facility Programming <br /> The consultant will develop multimodal hub site and facility program requirements, based off of <br /> stakeholder input and design guidance provided by stakeholders,which will outline the various <br /> space, access, and design needs and preferences.This will include requirements for: <br /> • Integration with train station <br /> • Required setbacks and zoning requirements <br /> • Transit vehicle access, circulation,and staging <br /> • Vehicular access and circulation <br /> • On-site parking and drop-off <br /> • Transportation Network Company(Uber/Lyft),taxi, and car share wait areas <br /> • Pedestrian and bicycle amenities, access, and circulation <br /> • Buildings and structures <br /> • Interior space operational and functional requirements for transportation related services <br /> (for public, employees, and transit drivers) <br /> • Any interior commercial or mixed-use space(otherwise not part of regular multimodal hub <br /> needs) <br /> • Any interior or exterior ancillary facilities (waste disposal, storage, HVAC, etc.) <br /> • Open space and landscaping <br /> • Signage, lighting, and wayfinding <br /> • Stormwater requirements <br /> • Utility requirements <br /> • Communications and technology requirements <br /> Task 4: Concept Plan/Conceptual Cost <br /> Using the site and facility programming requirements,the consultant will develop conceptual plans <br /> to a level sufficient to understand the facility sizing and site layout for use in a grant application.A <br /> planning-level cost estimate will be produced from this concept plan at a level sufficient to conduct <br /> a benefit/cost analysis(BCA)as part of a grant application. <br /> Deliverable: Conceptual site plan and planning-level cost estimate. <br /> Task 5: Draft and Final Report <br /> The consultant will prepare a draft and final Multimodal Hub Planning and Programming report.The <br /> final report will become the basis for Phase II grant preparation. <br /> Deliverable_A draft report will be provided for client and stakeholder review.The consultant will <br /> incorporate edits into a final report.The consultant will also provide to the client any digital <br /> information used in the preparation of the report(i.e., GIS and CAD files, concept plans, memos, <br /> cost worksheets). <br />