Agenda - 12-02-2024; 8-e - Authorization to Utilize Construction Manager at Risk for the Orange County Crisis Diversion Facility Project
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2024
>
Agenda - 12-02-2024 Business Meeting
>
Agenda - 12-02-2024; 8-e - Authorization to Utilize Construction Manager at Risk for the Orange County Crisis Diversion Facility Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 9:47:19 AM
Creation date
11/26/2024 9:49:40 AM
Metadata
Fields
Template:
BOCC
Date
12/2/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for December 2, 2024 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2024\Agenda - 12-02-2024 Business Meeting
OTHER-2024-101-Orange County Global Agreement for Capital
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-102-Approval of Addendums to Orange County Transportation Services-OCTS-On-call Professional Services Contract with WSP
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-103-Raise grant Pre-Planning
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
OTHER-2024-104-Procurement of Public Safety Communications Console Backup Radio Equipment
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2024
RES-2024-065-REFUND-RELEASE RESOLUTION
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
RES-2024-066-REFUND-RELEASE RESOLUTION
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> of the project. This management focus adds much value to the project. <br /> It is important to keep in mind that an adverse CMAR-Architect relationship can lead to some of <br /> the same issues that arise in a design-bid-build delivery method. By having the CMAR help <br /> select the Architect, the risk of an adverse relationship is minimized. <br /> As with any delivery method, incomplete and/or inaccurate construction drawings will result in <br /> change orders. The misunderstanding associated with the GMP is that this maximum price will <br /> not be exceeded in any case. It is important to understand that the GMP is based on the plans and <br /> specifications at the time of the GMP with some reasonable assumptions made and a reasonable <br /> contingency included. Major changes in scope will result in a change order, which increases the <br /> GMP contract. In addition, any Owner changes to the project and scope require a change order. <br /> By requiring the documents by 100% complete prior to receiving the GMP, the risk of <br /> unanticipated change orders are minimized. <br />
The URL can be used to link to this page
Your browser does not support the video tag.