Browse
Search
Agenda - 12-02-2024; 8-e - Authorization to Utilize Construction Manager at Risk for the Orange County Crisis Diversion Facility Project
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 12-02-2024 Business Meeting
>
Agenda - 12-02-2024; 8-e - Authorization to Utilize Construction Manager at Risk for the Orange County Crisis Diversion Facility Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 9:47:19 AM
Creation date
11/26/2024 9:43:00 AM
Metadata
Fields
Template:
BOCC
Date
12/2/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for December 2, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 12-02-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> of the project. This management focus adds much value to the project. <br /> It is important to keep in mind that an adverse CMAR-Architect relationship can lead to some of <br /> the same issues that arise in a design-bid-build delivery method. By having the CMAR help <br /> select the Architect, the risk of an adverse relationship is minimized. <br /> As with any delivery method, incomplete and/or inaccurate construction drawings will result in <br /> change orders. The misunderstanding associated with the GMP is that this maximum price will <br /> not be exceeded in any case. It is important to understand that the GMP is based on the plans and <br /> specifications at the time of the GMP with some reasonable assumptions made and a reasonable <br /> contingency included. Major changes in scope will result in a change order, which increases the <br /> GMP contract. In addition, any Owner changes to the project and scope require a change order. <br /> By requiring the documents by 100% complete prior to receiving the GMP, the risk of <br /> unanticipated change orders are minimized. <br />