Browse
Search
Agenda - 12-02-2024; 8-e - Authorization to Utilize Construction Manager at Risk for the Orange County Crisis Diversion Facility Project
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2024
>
Agenda - 12-02-2024 Business Meeting
>
Agenda - 12-02-2024; 8-e - Authorization to Utilize Construction Manager at Risk for the Orange County Crisis Diversion Facility Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 9:47:19 AM
Creation date
11/26/2024 9:43:00 AM
Metadata
Fields
Template:
BOCC
Date
12/2/2024
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda for December 2, 2024 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2024\Agenda - 12-02-2024 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> The following information about the Construction Manager at Risk process for <br /> procurement and building construction was compiled from Campbell County, <br /> Wyoming, and Procore, a leading project management software company. <br /> Construction Manager at Risk(CMAR)Delivery Method <br /> Background <br /> The Construction Manager at Risk(CMAR) is a delivery method which entails a commitment by <br /> the Construction Manager(CM) to deliver the project within a Guaranteed Maximum Price <br /> (GMP)which is based on the construction documents and specifications at the time of the GMP <br /> plus any reasonably inferred items or tasks. The CMAR provides professional services and acts <br /> as a consultant to the owner in the design development and construction phases. Often times, the <br /> CMAR also provides some of the actual construction of the project depending on the availability <br /> of bidders and the expertise the company has. In addition to acting in the owner's interest, the <br /> CMAR must manage and control construction costs to not exceed the GMP because <br /> contractually any costs exceeding the GMP that are not change orders are the financial liability <br /> of the CMAR. <br /> Generally, the CMAR will give the Owner a GMP after bidding the project. Included in this GMP <br /> is a contingency line item to take care of bid overages, reasonably inferred items and other project <br /> related items that may arise during construction. <br /> Owner Benefits <br /> This delivery method has several unique benefits to the Owner,including: <br /> • A higher level of cost control from the start. A successful CMAR project would involve <br /> hiring the CMAR prior to the architect and having the CMAR help select the architect. <br /> During the design process,the CMAR provides cost estimates at contractually established <br /> points. If these cost estimates are in line with the established budget, the architect then <br /> moves on to the next phase of design. If not, the CMAR, Owner and Architect assess the <br /> cost estimate and make design changes to bring the design back into budget alignment. <br /> This process ensures budget success. <br /> • The CMAR is an Owner advocate and manages the project with the Owner's best interest <br /> in mind at all times. <br /> • The CMAR takes burden off of the Owner in managing and coordinating the project. <br /> • The Owner's risk is limited by the CMAR process providing the construction documents <br /> are complete and proper allowances and contingencies are built into the GMP. <br /> • Constructability and value to the Owner are afforded by the Value Engineering expertise <br /> brought to the process by the CMAR. <br /> • CMAR services are professional services like architectural, engineering, surveying, etc. <br /> The CMAR's main purpose is not to construct the project,but to manage the construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.