Browse
Search
2024-723-E-AMS-Smith Sinnett Architecture-Design for Orange County Board of elections expansion for storage
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-723-E-AMS-Smith Sinnett Architecture-Design for Orange County Board of elections expansion for storage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2024 3:00:57 PM
Creation date
11/25/2024 3:00:39 PM
Metadata
Fields
Template:
Contract
Date
11/22/2024
Contract Starting Date
11/22/2024
Contract Ending Date
11/25/2024
Contract Document Type
Contract
Amount
$80,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Charter <br />Submitted by: Angel Barnes Page 3 of 3 <br />Constraints List any conditions that may limit the project team’s options with respect to resources, personnel, or schedule (e.g., <br />predetermined budget or project end date, limit on number of staff that may be assigned to the project). <br />The town of Hillsborough/HDC may impact the schedule, budget, and scope. <br />The construction schedule will be coordinated closely with staff to ensure we do not interfere with the preparation for voting, <br />or voting, after voting. <br />All security measures must be complied with and listed on the RFP to ensure that no one has access to any portions of the <br />building at any time without BOE staff present. <br />All work must be completed during normal business hours with minimal disruption to staff as the building will stay occupied <br />during the construction unless specific work requires the building to be empty. <br />External Dependencies Will project success depend on coordination of efforts between the project team and one or more other <br />individuals or groups? Has everyone involved agreed to this interaction? <br />General Contractor and subcontractor availability. <br />Equipment and material availability <br />Voting schedules <br />5. Communication Strategy (specify how the project manager will communicate to the Executive Sponsor, Project Team members <br />and Stakeholders, e.g., frequency of status reports, frequency of Project Team meetings, etc. <br />Email will be the primary form of communication for notices. <br />Meetings will be scheduled to review progress monthly. <br />Monthly status updates will be emailed. <br />Coordination communication will be email, phone, and in-person discussions as required once work starts and documented <br />through emails. <br />Emergency/Urgent items will be phone calls and documented with emails. <br />6. Sign-off <br />Name Signature Date <br />(MM/DD/YYYY) <br />Executive Sponsor <br />Department Sponsor <br />Project Manager <br />7. Notes <br />Docusign Envelope ID: F53FB4E0-B0D6-4E95-94C9-51D1A7F1B494
The URL can be used to link to this page
Your browser does not support the video tag.