Project Charter <br />Submitted by: Angel Barnes Page 2 of 3 <br />Deliverables List the high-level “products” to be created (e.g., improved xxxx process, employee manual on yyyy) <br />Add conditioned space for voting equipment, relocate existing HVAC equipment to the roof of the expansion, and add a <br />ramp for loading equipment on trucks. <br />Scope List what the project will and will not address <br />The BOCC approved $296,000.00 for AMS to expand the existing building over the covered patio area on the west side of <br />the building. This patio area is outside of the floodplain area. <br />Flooring – Carpet to match existing. <br />Painting of walls to match existing. <br />Electrical Requirements – Need outlets that drop down from the ceiling to accommodate the needs. Exact number of outlets <br />is to be determined during the design phase. <br />Data Requirements – Data outlets will be required on the walls, and a Wireless access point will be required to be installed <br />within the new space. <br />Walls – If possible remove the walls between the existing spaces to allow for expansion. See markup drawing. <br />Doors – Install new doors for exit and new doors in the corridor or exterior from the expanded board room, and loading and <br />personnel door from storage. The loading dock door may be able to come from the back of the building or from the south <br />side, these two options need to be looked into to determine which is the best location for large trucks to be able to access <br />for loading and unloading equipment. <br />Locksets – Need to include Corbin Russwin L4 Series locksets with blanks for AOK to rekey to the BOE key. <br />Electrical – Relocate security cameras, relocate exterior lights, remove unused lights, and how many light switches would <br />be needed (based on the number of doors entering the space). Emergency Exit lighting updates to existing exit and for new <br />exit. <br />Fire Alarm – Additional devices will be required to be installed. <br />HVAC – Space must be conditioned for the equipment. Existing HVAC units will be relocated (most likely on the roof of the <br />expanded area, roof access ladder will need to be installed (potentially from the attic space onto the new roof). Screening <br />around the HVAC equipment will be required. <br />Furniture – No requirements for this project for new furniture. <br />Signage – Wayfinding and room identification (interior and exterior signage) <br />Security – Card readers – relocate and reuse existing. Additional readers may be needed based on the final design and if <br />the transaction window is installed. <br />Safety – Fire Extinguisher(s) will be required in the new area, Evacuation Maps to be updated <br />Project Milestones Propose start and end dates for Project Phases (e.g., Inception, Planning, Construction, Delivery) and other major <br />milestones <br />The project should occur during the first 6 months of 2025 if at all possible, there are filings in July 2025, and additional <br />filings in December 2025 with the local election occurring in November. <br />Major Known Risks (including significant Assumptions) Identify obstacles that may cause the project to fail. <br />Risk Risk Rating (Hi, Med, Lo) <br />Historic District Commission Review High (Slow) <br />Building Permit High (Slow) <br />Material Availability/Labor Resources Med <br />Docusign Envelope ID: F53FB4E0-B0D6-4E95-94C9-51D1A7F1B494