Orange County NC Website
Orange County, NC August 8, 2024 <br />ASTRO® 25 Advanced Services Statement of Work <br />Advanced Services Detailed Description <br /> <br />Use or disclosure of this proposal is subject to the restrictions on the cover page. <br />Motorola Solutions <br />Page 54 <br />DISPATCH SITE CHECKLIST – LEVEL 1 <br />Recording Verify operator position being recorded on long term logging recorder, if included in <br />service agreement <br />Computer Performance Testing <br />Computer Reboot Reboot operator position computer. <br />Computer <br />Operational <br />Confirm the client computer is fully operational (if applicable). <br />Audio Testing <br />Conventional <br />Resources <br />Confirm all conventional resources are functional, with adequate audio levels and <br />quality. <br />Secure Mode Confirm any secure talkgroups are operational in secure mode. <br />Trunked <br />Resources <br />Confirm all trunked resources on screen are functioning by placing a call in both <br />directions, at the Customer's discretion, and at a single operator position <br />Backup Resources Confirm backup resources are operational. <br />Logging Equipment Testing <br />Recording - AIS <br />Test <br />Verify audio logging of trunked calls. <br />Recording With Customer assistance, test operator position logging on recorder. <br />System Alarms Review the alarm system on all logging equipment for errors. <br />Capture <br />Diagnostics <br />Perform recommended diagnostic tests based on equipment, and capture available <br />diagnostic logs. <br />Verify System <br />software Physical <br />media <br />Perform audit of software media on site. Verify that versions, KC numbers, and types <br />match what is deployed to the Customer server. <br />Playback Station (Motorola Provided) <br />Capture <br />Diagnostics <br />Perform recommended diagnostic tests based on equipment, and capture available <br />diagnostic logs. <br />Recall Audio Verify that radio and telephone audio can be recalled. <br /> <br />RF SITE CHECKLIST – LEVEL 1 <br />RF PM Checklist <br />Equipment Alarms Verify no warning or alarm indicators. <br />Verify AC/DC converter, RMC have been wired correctly on D series site. <br />Clean Fans and <br />Equipment <br />Use an antistatic vacuum to clean cooling pathways. <br />Site Frequency <br />Standard Check <br />Check LEDs for proper operation, PCA screens indicating potential faults for proper <br />operation <br />Basic Voice Call <br />Check <br />Voice test each voice path, radio to radio. <br />Docusign Envelope ID: AD07CE02-1F94-4496-ABD0-D61F9CBE562C