Orange County NC Website
Orange County, NC August 8, 2024 <br />ASTRO® 25 Advanced Services Statement of Work <br />Advanced Services Detailed Description <br /> <br />Use or disclosure of this proposal is subject to the restrictions on the cover page. <br />Motorola Solutions <br />Page 25 <br />Motorola Responsibilities <br />Motorola will fulfill the following responsibilities to provide the ASTRO 25 Connectivity Service. <br />• Perform a site survey prior to installation to assess that all the conditions for a proper site <br />installation can be met, including, but not limited to the presence of network facilities necessary <br />to provide the necessary connectivity. <br />• Motorola will note any variations of the site that would affect the hardware specifications or <br />estimated labor involved for a standard installation. If the site survey indicates a non -standard <br />installation (for example, the need for construction of “last m ile” network facilities), then a <br />mutually agreed change order may be required. <br />• It is assumed that in the building, LTE coverage is adequate at the installation site. If, during <br />installation, it is determined the in-building LTE coverage is not adequate for service, then a <br />mutually agreed change order may be required for external ante nna installation. <br />• Standard Demarc – Motorola will install cable between the Local Exchange Carrier Minimum <br />Point of Entry (MPOE) and the Managed Elements located within the customer ASTRO <br />infrastructure. Motorola will install the demarc standard – which includes one service call, up to <br />two (2) total hours of on-site labor, and installation of one (1) cat 3, 5, or 5e cable drop up to 150 <br />feet (vertical length up to 12 feet), connectors, ty-wraps, jacks, face plates, and cable. A <br />mutually agreed change order may be required if the site survey indicates a non-standard <br />extended demarc (for example, the need for cable through walls over 150’ or multiple floors). <br />• Install equipment supplied by Motorola. Installation period is estimated to be within 45 business <br />days from when Motorola and Customer execute the Agreement and related addendum or <br />addenda. <br />• Cooperate with the Customer to schedule the ASTRO 25 Connectivity Service implementation. <br />• Administer safe work procedures for installation of the remote access circuit. <br />Customer Responsibilities <br />• Sign the Transport Connectivity Addendum (TCA). <br />• Provide space for the networking equipment at the core site. <br />• Ensure communications sites meet space, grounding, power, and connectivity requirements for <br />equipment installation. <br />• Obtain all licensing, site access, or permitting required for project implementation. <br />• Provide a dedicated delivery point (such as a warehouse), for receipt, inventory, and storage of <br />equipment prior to delivery to the site(s), if requested by Motorola. <br />• Ensure existing sites or equipment locations have sufficient space available for the system, as <br />specified by Motorola's R56 Standards and Guidelines for Communication. <br />• Ensure that existing sites or equipment locations have adequate electrical power in the proper <br />phase, in the proper voltage, and with necessary site grounding to support the requirements of <br />the equipment provided with the ASTRO 25 Connectivity Service. <br />• Perform any location upgrades or modifications. <br />• Obtain and maintain approved local, State, or Federal permits necessary for installing and <br />operating the proposed equipment. <br />• Provide any required system interconnections not specifically included in the ASTRO 25 <br />Connectivity Service. <br />Docusign Envelope ID: AD07CE02-1F94-4496-ABD0-D61F9CBE562C