COST CALCULATION <br />250 225 220 210 245 190 165 135 78 Total <br />Estimates Senior PM Electrical Engr Structural Engr Civil Engr Study Specialist Project Engr Archi Designer Scheduler Doc Control <br />Pre-Design Meeting 1 1 1 1 1 1 1 1 1 9 <br />30% Design 0 <br /> Information from County 2 2 <br /> Co-ordination with Utility 6 6 2 4 18 <br /> Review of Information from County 4 4 4 4 4 2 22 <br /> Review of Applicable Codes and <br />Standards 2 4 4 4 4 4 2 24 <br /> Review of Utility Information 4 4 4 4 2 18 <br /> Site Assesment 4 4 2 8 2 4 24 <br /> Identify Porential Location for Utility <br />Connection 2 4 4 4 14 <br /> Identify Optimal Location for EV <br />Infrastructure 2 4 5 5 16 <br /> Conceptual Plan 4 8 2 4 6 12 36 <br /> Internal Q&C 2 2 2 2 2 10 <br /> 30% Design Submission 2 3 5 <br /> Customer Review of 30% <br />Submission 0 <br />TOTAL HOURS 30%31 41 20 25 15 38 13 3 12 198 <br />Total Cost 30% Design 7,750.0$9,225.0$4,400.0$5,250.0$3,675.0$7,220.0$2,145.0$405.0$936.0$41,006.0$ <br />60% Design 0 <br /> Review of 30% Design Comments 1 1 1 1 1 5 <br /> Meeting With Customer (as <br />needed)1 1 1 1 1 1 6 <br /> Incorporation of Comments from <br />Customer 0 <br /> Verify the utility capacity and finalize <br />the point of interconnection.6 8 5 5 24 <br /> Site grading,2 2 2 16 4 26 <br /> Preparation of Site Plan,1 2 2 2 12 19 <br /> Foundation plan,2 1 24 1 2 30 <br /> Electrical One line Diagram and panel <br />schedules,6 24 4 34 <br /> Equipment Specification,4 12 6 22 <br /> Internal Q&C 2 4 4 4 4 18 <br /> 60% Design Submission 1 4 5 <br /> Customer Review of 60% <br />Submission 0 <br />TOTAL HOURS 60%24 55 34 23 10 25 12 2 4 189 <br />Total Cost 60% Design 6,000.0$12,375.0$7,480.0$4,830.0$2,450.0$4,750.0$1,980.0$270.0$312.0$40,447.0$ <br />95% Design 0 <br /> Review of 60% Submission Comments 1 1 1 1 1 1 6 <br /> Meeting With Customer 1 1 1 1 1 1 1 1 1 9 <br /> Incorporation of Comments from <br />Customer 0 <br /> Site Plan 2 4 4 4 14 <br /> Electrical one-line diagram.2 8 10 <br /> Finalization of the specification for the <br />equipment.4 8 4 4 4 24 <br /> Trench and Conduit Plan and details.4 8 8 4 10 34 <br /> Design of steel pedestal or applicable <br />steel structure including the connection <br />details <br />2 8 2 8 20 <br /> Design of AC and LAN cable system 2 8 2 12 <br /> Design of panel with breakers.2 8 2 4 16 <br /> Design of bollard footing.1 3 1 6 11 <br /> Propose utility improvement plans.2 6 4 1 13 <br /> Preparation of Bill of Materials and <br />Cost Estimate 2 8 8 8 8 34 <br /> Internal Q&C 2 8 8 8 2 28 <br /> 95% Design Submission 1 4 5 <br /> Customer Review of 95% Design <br />Submission 0 <br />TOTAL HOURS 95%27 68 41 21 6 32 33 3 5 236 <br />Total Cost 95% Design 6,750.0$15,300.0$9,020.0$4,410.0$1,470.0$6,080.0$5,445.0$405.0$390.0$49,270.0$ <br />100% Design 0 <br /> Review of 95% Submission Comments 1 1 1 1 1 5 <br /> Incorporation of Comments from <br />Customer 0 <br /> Preperation of Construction <br />Specification (Bid Packages)6 16 8 8 38 <br /> Internal Q&C 4 4 4 4 2 18 <br />Appendix B 1 3 1 1 3 <br /> 100% Design Submission 1 4 5 <br /> Customer Review of 100% Design <br />Submission 0 <br /> Revision of 100% deisgn submittal (if <br />applicable)0 <br /> Approval of 100% design submittal 0 <br /> Issue 100% Documents Signed and <br />Sealed 1 2 2 2 2 2 2 4 17 <br />TOTAL HOURS 100%13 26 16 6 3 14 5 1 8 83 <br />Total Cost 100% Design 3,250.0$5,850.0$3,520.0$1,260.0$735.0$2,660.0$825.0$135.0$624.0$18,859.0$ <br />149,582.0$ TOTAL DESIGN COST <br />Price: Task Breakdown & Associated Fees <br />Tasks/Rate ($/hr) <br />Page 9 of 9 <br />Attachment 1Docusign Envelope ID: C9F02BE8-AE2A-4BE1-874D-0AE2AA324629