Browse
Search
2024-700-E-OCTS Dept-Equagen Engineers-Design & Engineering services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-700-E-OCTS Dept-Equagen Engineers-Design & Engineering services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:50:26 AM
Creation date
11/21/2024 9:50:02 AM
Metadata
Fields
Template:
Contract
Date
11/8/2024
Contract Starting Date
11/8/2024
Contract Ending Date
11/15/2024
Contract Document Type
Contract
Amount
$149,582.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID Task <br />Mode <br />Task Name Duration Scheduled Finish <br />1 Contract Effective Date 1 day Mon 11/4/24 <br />2 Pre-Design Meeting 1 day Fri 11/8/24 <br />3 Design and Engineering Services for the Electric Vehicle Charging <br />Stations, Orange County, NC <br />119 days Thu 4/24/25 <br />4 30% Design 32 days Tue 12/24/24 <br />5 Information from County 7 days Tue 11/19/24 <br />6 Co-ordination with Utility 15 days Fri 11/29/24 <br />7 Review of Information from County 5 days Tue 11/26/24 <br />8 Review of Applicable Codes and Standards 5 days Thu 11/21/24 <br />9 Review of Utility Information 5 days Tue 12/3/24 <br />10 Site Assesment 3 days Fri 11/29/24 <br />11 Identify Porential Location for Utility Connection 4 days Mon 12/9/24 <br />12 Identify Optimal Location for EV Infrastructure 4 days Thu 12/5/24 <br />13 Conceptual Plan 5 days Thu 12/5/24 <br />14 Internal Q&C 2 days Mon 12/9/24 <br />15 30% Design Submission 1 day Tue 12/10/24 <br />16 Customer Review of 30% Submission 10 days Tue 12/24/24 <br />17 60% Design 28 days Fri 1/31/25 <br />18 Review of 30% Design Comments 1 day Wed 12/25/24 <br />19 Meeting With Customer (as needed)1 day Thu 12/26/24 <br />20 Incorporation of Comments from Customer 10 days Wed 1/8/25 <br />21 Verify the utility capacity and finalize the point of interconnection.5 days Thu 1/2/25 <br />22 Site grading 3 days Wed 1/1/25 <br />23 Preparation of Site Plan 5 days Wed 1/8/25 <br />24 Foundation plan 4 days Tue 1/14/25 <br />25 Electrical One line Diagram and panel schedules,4 days Tue 1/14/25 <br />26 Equipment Specification,4 days Tue 1/14/25 <br />27 Internal Q&C 2 days Thu 1/16/25 <br />28 60% Design Submission 1 day Fri 1/17/25 <br />29 Customer Review of 60% Submission 10 days Fri 1/31/25 <br />30 95% Design 38 days Wed 3/19/25 <br />31 Review of 60% Submission Comments 1 day Mon 2/3/25 <br />32 Meeting With Customer 1 day Tue 2/4/25 <br />33 Incorporation of Comments from Customer 7 days Wed 2/12/25 <br />34 Site Plan 3 days Wed 1/29/25 <br />35 Electrical one-line diagram.4 days Thu 1/30/25 <br />36 Finalization of the specification for the equipment.5 days Thu 2/6/25 <br />37 Trench and Conduit Plan and details.5 days Wed 2/12/25 <br />38 Design of steel pedestal or applicable steel structure including the connection <br />details <br />5 days Thu 2/13/25 <br />39 Design of AC and LAN cable system 5 days Thu 2/13/25 <br />40 Design of panel with breakers.5 days Thu 2/13/25 <br />41 Design of bollard footing.3 days Mon 2/3/25 <br />42 Propose utility improvement plans.5 days Thu 2/20/25 <br />43 Preparation of Bill of Materials and Cost Estimate 5 days Thu 2/20/25 <br />44 Internal Q&C 3 days Tue 2/25/25 <br />45 95% Design Submission 1 day Wed 2/26/25 <br />46 Customer Review of 95% Design Submission 15 days Wed 3/19/25 <br />47 100% Design 35 days Thu 4/24/25 <br />48 Review of 95% Submission Comments 1 day Thu 3/20/25 <br />49 Incorporation of Comments from Customer 5 days Thu 3/27/25 <br />50 Preperation of Construction Specification (Bid Packages)15 days Thu 3/27/25 <br />51 Internal Q&C 2 days Mon 3/31/25 <br />52 100% Design Submission to Customer 2 days Wed 4/2/25 <br />53 Customer Review of 100% Design Submission 10 days Wed 4/16/25 <br />54 Revision of 100% deisgn submittal (if applicable)3 days Mon 4/21/25 <br />55 Approval of 100% design submittal 1 day Tue 4/22/25 <br />56 Issue 100% Documents Signed and Sealed 2 days Thu 4/24/25 <br />8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 2 9 16 23 30 6 13 20 27 <br />Oct '24 Nov '24 Dec '24 Jan '25 Feb '25 Mar '25 Apr '25 May '25 <br />Task <br />Split <br />Milestone <br />Summary <br />Project Summary <br />Inactive Task <br />Inactive Milestone <br />Inactive Summary <br />Manual Task <br />Duration-only <br />Manual Summary Rollup <br />Manual Summary <br />Start-only <br />Finish-only <br />External Tasks <br />External Milestone <br />Deadline <br />Progress <br />Manual Progress <br />Page 1 <br />Project: Project1 <br />Date: Fri 11/1/24 <br />Page 7 of 9 <br />Attachment 1 <br />SCHEDULE <br />Docusign Envelope ID: C9F02BE8-AE2A-4BE1-874D-0AE2AA324629