Orange County NC Website
Inclusions <br />1.Freight <br />2. Engineering <br />3. Project Management for Siemens Scope of work. <br />4. System Commissioning and Final Pretest. <br />5. Final AHJ Testing and certification. <br />6. Fire Alarm Submittal to customer. <br />7. Fire Alarm Submittal to AHJ. <br />8. Fire Alarm Permit and Electrical Permit. <br />9. Overtime. <br />10. Supply and installation of any electrical conduits, cables, and speaker wiring. <br />11. As per existing conditions noted during site walk, as shown on drawings, and as defined in this proposal <br />12. Demolition and disposal of the existing fire alarm system. <br />13. Wireless cellular fire alarm communicator. <br />14. One (1) year warranty. <br />15. Customer training: 2 Hours <br />16.Final wiring terminations to the control panel. <br />17. One (1) submittal. <br />18. One (1) O&M manuals. <br />19. Programming. <br />20. Creating base building auto cad drawings for the project <br />21. Performance or payment bonds. <br />22. New Speaker cabling. <br />Page 5 of 11 <br />Docusign Envelope ID: 54E40A76-3366-4569-85E0-46E021F72D89