Browse
Search
2024-675-E-AMS-Landmark Management Partners-Efland Community Center Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2024
>
2024-675-E-AMS-Landmark Management Partners-Efland Community Center Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2024 9:34:57 AM
Creation date
11/21/2024 9:34:38 AM
Metadata
Fields
Template:
Contract
Date
11/1/2024
Contract Starting Date
11/1/2024
Contract Ending Date
11/5/2024
Contract Document Type
Contract
Amount
$288,000.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Revised 01/24 <br /> <br /> <br />1 <br /> [Departmental Use Only] <br /> TITLE Efland Community Center-Reno <br /> <br /> FY 2024/2025 <br />NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br /> <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called “Agreement”), made as of the 30th <br />day of September, 2024, by and between Landmark Management Partners, LLC, (hereinafter called the <br />“Contractor”), and Orange County, a political subdivision of the State of North Carolina, (hereinafter <br />called the “County,” “Orange County,” or “Owner”). <br /> <br />W I T N E S S E T H: <br /> <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> <br />1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br /> <br />a. This Agreement. <br /> <br />b. Designer Approved Bulletins and Field Orders. <br /> <br />c. Request for Proposals and addenda thereto. <br /> <br />d. Proposal. <br /> <br />2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br /> <br />a. Construction Drawings prepared by Bret Horton (Sheet dated ) <br /> <br />b. Written specifications prepared by the project engineer. <br /> <br />c. To enclose the rear patio along with interior bathroom renovations and asssociated <br />electrical, plumbing, HVAC and other works detailed in the attached plans numbered A0- <br />FA2 at the Efland Community Center, located at 117 Richmond Rd, Mebane NC 27302. <br />Please see attached BID proposal dated October 1, 2024 which fully describes the work to <br />be performed. Such work will hereafter be called the “Work”. <br /> <br />d. Related documents listed under Section 1 above. <br /> <br />Docusign Envelope ID: 1C7ED1D1-5E77-4A65-9197-5DBBABEB67C6
The URL can be used to link to this page
Your browser does not support the video tag.