Browse
Search
Agenda - 05-04-2004-5m
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 05-04-2004
>
Agenda - 05-04-2004-5m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:43:38 PM
Creation date
8/29/2008 10:41:41 AM
Metadata
Fields
Template:
BOCC
Date
5/4/2004
Document Type
Agenda
Agenda Item
5m
Document Relationships
Minutes - 20040504
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<~ <br />building should be weatherproofed--fix the roofs--and structurally sound--check the sills. Paint <br />the exterior one quick coat of white paint to make it look better. Board the windows with <br />matching plywood painted to look like windows and put one louvered metal vent in each <br />"window" to provide a little airflow. Make sure the doors are secure and can be locked. Rebuild <br />the front porch so no one can fall through, Block off the back porch using the fake window look. <br />(I would recommend leaving the back porch on for now. Removing it would expose interior <br />materials to the elements and likely lead to more serious (costly problems) in the long run.) <br />I would be happy to participate in future sessions to consider possible uses for the Laws House <br />and to facilitate the preparation of cost estimates for renovation. All of the buildings at our future <br />park sites will require maintenance plans, We should be careful not to eliminate a part of our <br />rural heritage without considering all options carefully. <br />Ballpark cost estimates for the seven alternatives: <br />O tions Other considerations Pro'ect Costs <br /> <br />1) Demolish house Bid to demolition crews <br /> Landfill costs <br />2) Deconstruct house Estimates for Pete Hendricks, may wish to bid $13,000-$15,000 <br /> out to other contractors <br /> What to da with the material: storage, reuse <br /> issues <br />3) Move house off site Time constraints & finding a willing buyer Give ar sell building to <br /> Expect $40,000 to move house plus someone who will move i <br /> rehabilitation costs o tion #6 $100,000 <br />4) Relocate house on site Moving costs plus $40,000-$45,000 <br /> rehabilitation ex enses o tion #6 $100,000 <br />5) Stabilize Casts contribute toward total renovation $9,000-$12,000 <br /> o tion #6 <br />6) Renovate for reuse Quality restoration includes same if not all $100,000-$125,000 <br /> rofessional desi n services <br />7) Renovate exterior, only Costs may contribute toward total renovation i $20,000-$25,000 <br /> ursued in future as later hase <br />C:AUocuinenlS and Settlnys~Adminlstrztor~LUCaI Sclltng,~,~Semp~ClP budge( 2004-Laws~Eztra (Joc <br />
The URL can be used to link to this page
Your browser does not support the video tag.