Orange County NC Website
24 <br /> addition will expands programs for skilled trades, allied health, EMS, public safety, and will provide <br /> a courtyard and additional facilities for students. <br /> Slide #3 <br /> Durham Tech Capital Construction <br /> Sustainability Goals <br /> Overall Targets: <br /> > 25%Reduction in Energy Use and Associated Carbon Estimates <br /> > Achieved with additional investment of$159,000 with Electric Heat <br /> Pump in New Addition <br /> > 35%Reduction in Indoor Water Use <br /> > Achieved within the existing New Addition budget with code compliance <br /> >45%Reduction in Lighting Energy Use <br /> > Achieved within the existing New Addition budget with LED Lighting <br /> installed;achieved in current building with additional investment of <br /> $115,387 for LED Lighting <br /> > 1O0%Reduction in Outdoor Water Use <br /> > Achieved within the existing New Addition budget with a balance of <br /> draught-tolerant landscaping and/or rainwater harvestingfor irrigation <br /> durhamtech.edu �. <br /> Slide #4 <br /> Funding Summary <br /> The belowtable providesa summary of the necessaryfundingrequired to implement these <br /> sustainability targets: <br /> Board of County Commissioners Request: <br /> LED Lighting Replacement In Existing Building $115,387.00 <br /> Carbon Reduction vla Electric Heat Pumps,New Addltion $159,000.00 <br /> Total $274,387.00 <br /> Cost for Entire Building: <br /> Carbon Reduction via Electric Heat Pumps,Ex Building $3,920,000.00 <br /> Total $3,920,000.00 <br /> durhamtech.edu - <br /> Chair Bedford said the Board very much supports this request. <br /> A motion was made by Commissioner Fowler, seconded by Commissioner McKee, to <br /> approve Budget Amendment#2-A to fund the two proposed purchases outlined above. <br />