Orange County NC Website
23 <br /> Total Project Funding 1 $11,000,0*1 $275,000 1 $11,275,000 <br /> Appropriated for this project: <br /> Current FY 2024-25 FY 2024-25 <br /> FY 2024-25 Amendment Revised <br /> Project Expenditures $11,000,000 $275,000 $11,275,000 <br /> Total Costs $11,000,000 $275,000 $11,275,000 <br /> Dr. Susan Bowen, Vice President and Chief Campus Operations Officer, made the <br /> following presentation: <br /> Slide #1 <br /> DURHAM <br /> i&V TECH <br /> Orange County Campus Building Addition <br /> Dr. Bowen noted that President Buxton was also in attendance. <br /> Slide #2 <br /> Orange County Campus <br /> Building Addition <br /> Dr. Bowen said with the help of the Board's funding, Durham Tech is in the process of <br /> constructing a 14,000 square foot, two-floor addition to the current building. She said that the <br />