Orange County NC Website
ORD-2024 - 041j <br /> J ORANGE COUNTY <br /> BOARD OF COMMISSIONERS <br /> ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date : November 19 , 2024 <br /> Action Agenda <br /> Item No . 8 -g <br /> SUBJECT : Sportsplex Ice Rink Cooling Tower and Chiller Replacement Contract Award and <br /> Approval of Budget Amendment # 3 - 13 <br /> DEPARTMENT : Asset Management Services , <br /> Finance and Administrative <br /> Services <br /> ATTACHMENT ( S ) : INFORMATION CONTACT . <br /> 1 . Construction Contract Angel Barnes , 919 . 245 . 2628 <br /> 2 . Year-to - Date Budget Summary Jovana Amaro , 919 . 245 . 2651 <br /> Alan Dorman , 919 . 245 . 2658 <br /> i <br /> c <br /> PURPOSE : To : <br /> 1 ) Approve the County entering into a construction contract with Brady Services , Inc . for the <br /> construction of the Sportsplex Ice Rink Chiller and Cooling Tower Replacement ; and <br /> 2 ) Authorize the County Manager to execute the Agreement , subject to final review by the <br /> County Attorney , and any subsequent amendments for contingent and unforeseen <br /> requirements up to the approved budget amount on behalf of the Board . <br /> 3 ) Approve Budget Amendment # 3 - 13 . <br /> E <br /> t <br /> I <br /> BACKGROUND : In 1995 , the Triangle Sportsplex was built , including an ice rink . The design and <br /> construction included a water- cooled chiller and a cooling tower to create and maintain the ice . <br /> The current chiller system utilizes ammonia , which is often found in older chillers used for ice <br /> E <br /> rinks . However , this presents health and safety risks if ammonia is released due to equipment <br /> failure or maintenance mistakes . Furthermore , both the existing cooling tower and chiller system <br /> have exceeded their useful life , and ammonia is no longer supplied by major chiller manufacturers . <br /> The ice rink cannot function without the chiller continuously operating to maintain the ice , as the <br /> chiller pumps cold brine beneath the ice rink floor to create and preserve the ice . <br /> The recommended solution is to replace the ammonia chiller with an air- cooled chiller that can <br /> produce sufficiently cold water for ice - making . This single unit will replace both the cooling tower <br /> and the water- cooled chiller . The construction of this project is expected to take approximately <br /> four (4 ) weeks . During this time , the ice rink will be non - operational for a total of two (2 ) weeks , or <br /> no more than fourteen ( 14 ) days . The work involves adding a new concrete pad for the air- cooled <br /> chiller , installing new piping and connections inside the chiller room , and setting up pumps and <br /> electrical systems while the existing water- cooled chiller remains operational . After completing all <br />