Browse
Search
Agenda - 12-05-2005-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 12-05-2005
>
Agenda - 12-05-2005-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:38:17 PM
Creation date
8/29/2008 10:41:40 AM
Metadata
Fields
Template:
BOCC
Date
12/5/2005
Document Type
Agenda
Agenda Item
5j
Document Relationships
Minutes - 20051205
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At the October 18 Board meeting, the Board approved an Energy Conservation Manager <br />appointment and the search is now underway for an employee to assume these <br />responsibilities. <br />• At December 5 Board meeting, staff will present far the Board's consideration: <br />/ A draft Energy Conservation Policy designed to reduce energy consumption in <br />County government facilities and improve energy efficiency both as a cost savings <br />measure and to protect the environment, <br />/ A report on County building energy costs, energy consumption and possible <br />performance measures far tracking progress, <br />/ A draft vehicle fuel conservation policy for the Board's consideration to address the <br />need to promote fuel efficiency and fuel cost savings, <br />/ A report on vehicle fuel costs, consumption and possible performance measures for <br />tracking progress, <br />FINANCIAL IMPACT: There is no financial impact of adopting the Environmental Responsibility <br />Goal. The action strategies that would be created to implement the goal may have financial <br />impacts that are not yet known. In terms of the energy conservation initiative, a primary <br />consideration is to reduce energy costs and/or mitigate energy cost increases. Costs <br />associated with specific equipment, system improvement or system replacement will be <br />addressed through the Capital Improvement Plan process. <br />RECOMMENDATION(S): The Manager recommends that the Board discuss and adapt the <br />attached draft Environmental Responsibility Goal, with changes as desired, <br />
The URL can be used to link to this page
Your browser does not support the video tag.